Top-rated rototilling pros.

Get matched with top rototilling pros in Akeley, MN

Enter your zip and get matched with up to 5 pros

Need a pro for your rototilling project in Akeley, MN?

Select your specific project to find the pro for you.

Find Rototilling pros in Akeley

Richards Forestry

No reviews yet

Richards Forestry

No reviews yet
18 years of experience

TREE SREVICE -PESTICIDE APPLICATOR-EXCAVATING-BOBCAT WORK-PONDS-AND WATER FALLS-YARD SERVICE DOCK SERVICE SHORELINE RESTORATION-RIP-RAP RETAINING WALLS BOULDER WALLS TRUCKING

TREE SREVICE -PESTICIDE APPLICATOR-EXCAVATING-BOBCAT WORK-PONDS-AND WATER FALLS-YARD SERVICE DOCK SERVICE SHORELINE RESTORATION-RIP-RAP RETAINING WALLS BOULDER WALLS TRUCKING


Rototilling questions, answered by experts

Typically 1-3 days, depending on property size and terrain condition.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

When leveling the ground for a pool. If the ground is mostly level, you may be able to simply lay down pavers or pool pads to support the pool. However, you’ll still need to level the ground with sand as a base before adding other materials on top, like crushed gravel.

Grading refers to the sloping of your yard away from your house’s foundation. It’s a landscaping term you probably know well if you’ve ever had to push your lawn mower up a steep slope.

Leveling is the solution to grading issues since it involves making your yard flat and smooth (and easy to push a lawn mower through).

Water pooling, uneven surfaces, or basement leaks are indicators.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.