Top-rated solar panel pros.

Get matched with top solar panel pros in Kinde, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your solar panel service project in Kinde, MI?

Select your specific project to find the pro for you.

Find Solar panel pros in Kinde

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)
Solar Water Heater System - InstallSolar Water Heater System - Install - For BusinessSolar Water Heater System - Repair+1 more

Serving Kinde, MI and surrounding areas

In business since 1971

Credit card accepted

"The last was a rental company that we have and we used them for an air conditioning and heating system. It was Bototach Mechanical. It’s been a good program for us. They’re very responsive. I don’t know what the thought process was. My husband said, well let’s try these guys and so we did. We have an older home and it’s proved to be a very good deal. The quality has been pretty good, so I would give them an A for the quality. I will give you one helpful hint though. If the company decides they want to replace an appliance, you need to call them and negotiate with them because you can upgrade, but you need to talk to them in person not just do it over the internet."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Solar Panels questions, answered by experts

In most states, solar installers need to be licensed and insured as solar professionals, although some states don’t have specific requirements for installers. You can use our state licensing tool to check if an installer you’re considering hiring holds the proper licensing. No matter where you live, a member of your solar panel installation company must be a certified electrician to connect your panels to your home and the electric grid.

The time it takes to install solar panels depends on the number of panels and the size of your home, but installation takes between two and three days of work. While most contractors can install the panels over the course of a couple of days, switching to solar energy can take two to three months in total. This includes the time it takes to design the system, procure the parts, obtain the permits, install the panels, connect to the main power grid, and get an inspection.

Although solar panels harness the sun's power, they come at an environmental cost. The manufacturing process requires large amounts of water and involves hazardous materials like cadmium, silicon, and gallium arsenide. These materials don’t pose safety hazards while the panels are in use but can pose a problem when left in landfills. Over time, hazardous materials can leach into the environment. This is why recycling solar panels whenever possible is better than taking them to landfills.

Professionals use the same methods to install solar shingles that they do for asphalt shingles, so you’ll often see a similar installation timeline of one to two days. The amount of time required will depend on the size and slope of your roof and the number of shingles installed. Weather conditions can delay installation, as working on a roof is unsafe during high winds or heavy rain.

In almost every case, solar panels need to be removed to replace roof shingles. In some cases, such as solar installations where the panels are on raised platforms above the roof surface, installers may be able to install new shingles without removing the solar installation. However, to get a quality roofing installation, panels need to come off. Most roofing contractors won’t remove or reinstall solar panels as part of a roofing project, so you’ll need to contact your solar provider.

The Kinde, MI homeowners’ guide to solar panel services

From average costs to expert advice, get all the answers you need to get your job done.