"We added a patio enclosure to part of our deck area at a country house that we own. The experience was extraordinary from the minute that we met with Andrew Mulichak, our design consultant, through to the completion of the project. At the point that we signed the contract, a completion estimate of 10 weeks was given. Three weeks after we signed the contract, we received a call that the patio enclosure was ready to be installed. The install team took a half day to get the site ready, and then 1.5 days to complete the project. We absolutely love the end result and it came out even better than what we thought when we signed the contract. The advantage of working with Patio Enclosures is that this is their primary business activity and they control the entire supply chain. Based on our experience, I would highly recommend them for any type of comparable project."
"It was fine. They came on time to fill the crack in the basement wall. They did not tell me that they were using a different product and would need to come back the next day. It has survived one rain, but of course I won't know for sure for some time whether the repair will hold. They were easy to deal with."
"Dan and his team of Clinton and Julie worked very hard installing a stone step to exit a room on the South side of my house. Julie also pruned a large and unwieldy Rhododendron in my front yard. Dan kept me informed as to when they would arrive and they were very polite and considerate. I am happy with the results. The new step is a wedge-shaped stone that will drain rain water and it provides a comfortable distance for stepping to the outside of the house."
"I hired innovative construction to reside one side of my building. During the bidding of the project as well as during the execution of the work, Greg and his team were professional, timely and responsive. I would absolutely hire Greg and his team again"
"D&D was quick to call us back, to walk the site and give us a quote, they started the job earlier than they thought they could, and worked all day/ every day to finish the job. The yard was raked, leveled, and seeded . Dustin is a knowledgeable professional, we couldn't be happier with the install. We were so pleased with his work that we hired him to do some extra grading for us."
"Cody & crew were great to work with! Arrived on site on schedule, great communication thru the project, and I was left with an outstanding product. I look forward to working with them again!"
Your maintenance needs revolve around the type of foundation you choose, as well as how you furnish or decorate it. Patios require little else other than the occasional hose-down, but decks and other wooden structures will require annual power washing and sealing. You may also need to restain the wood every two to three years.
Adding a solid roof rather than building a pergola or leaving the space open will make maintenance much easier. Without a roof, you will need to spend more time sweeping, washing, and covering your furniture to protect it from UV bleaching.
If you have multiple rooms that could use some organization, home storage solutions like cubbies in your mudroom or built-in shelving can help you move clutter off the floor. Take it one step further by pairing shelves and cabinets with personalized aesthetic touches like woven or canvas lined metal baskets to add another organizational element.
Yes, with proper heating or cooling systems and energy-efficient glazing.
Yes, but ensuring the deck has a solid foundation with adequate footings is critical before building, as the weight of a sunroom will put significant pressure on the structure below. Even if your deck is properly constructed, it may not be able to handle the extra weight. While some basic, lightweight, prefabricated sunrooms can sit on a deck with a strong existing foundation without additional supports, in many cases, the foundation and joists will need reinforcement. It is always best to have a structural engineer perform an inspection to evaluate the deck's quality and structural integrity. A professional can help you decide if reinforcement is sufficient or if it's better to tear down the deck and start over.
Building a sunroom can take anywhere from two weeks to six months. An average-sized sunroom typically takes between two and eight weeks to complete, but more elaborate or larger projects can take longer. The final timeline depends on factors such as the sunroom's size, features, structural requirements, type, and whether it's a retrofit or a new build from scratch.
The Waldoboro, ME homeowners’ guide to patio services
From average costs to expert advice, get all the answers you need to get your job done.
Make your patio a calm retreat or a tropical getaway with these 11 best patio plants. Many varieties do well in the shade, while others prefer full sun. You’ll find pet-friendly patio plants and fruits you can use in your favorite recipes.
Deck vs. patio — what’s the difference and which one is the better choice? Dive into the pros, cons, and more, and make the perfect decision for your home.