Top-rated rototilling pros.

Get matched with top rototilling pros in Palermo, ME

There are 0 highly-rated local rototilling pros.

Need a pro for your rototilling project in Palermo, ME?

Select your specific project to find the pro for you.

Find Rototilling pros in Palermo

"Great! He kept in touch and arrived when he said he would. He is clean and personable. He was able to finish within his estimated time for this project."

Robin B on July 2024

Soucys property improvements llc is your go-to handyman. over 15 years experience on improving properties.

"Great! He kept in touch and arrived when he said he would. He is clean and personable. He was able to finish within his estimated time for this project."

Robin B on July 2024




Rototilling questions, answered by experts

Typically 1-3 days, depending on property size and terrain condition.

Not typically. A paver patio drainage problem generally requires a landscaping fix that can include a drainage pipe or dry well capable of handling the amount of runoff in your yard.

Water pooling, uneven surfaces, or basement leaks are indicators.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

Hardscaping often requires preparation of the ground in the area where the feature is being installed. This can include digging, compacting, and leveling the soil, ensuring adequate drainage, and removing any existing plants. The extent of preparation needed will depend on the type and size of the hardscaping feature being installed.

By submitting this question, I acknowledge and agree that Angi may publicly display my name, city, state, and question on the website for professionals and others to see.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.