Top-rated solar panel pros.

Get matched with top solar panel pros in Hancock, ME

Enter your zip and get matched with up to 5 pros

Need a pro for your solar panel service project in Hancock, ME?

Select your specific project to find the pro for you.

Find Solar panel pros in Hancock

Avatar for New England Home Renovations LLC
New England Home Renovations LLC
4.0(
311
)
Solar Water Heater System - InstallSolar Water Heater System - Install - For BusinessSolar Water Heater System - Repair+1 more

Serving Hancock, ME and surrounding areas

In business since 1983

Free estimates

Emergency services offered

"When working around the house I noticed that my main circuit breaker panel was suffering some severe corrosion which turned out to be due to a leak coming down the main power cable. NE Renovations had gotten good reviews so I asked them and others for a quote. The NE Renovations team (I believe sub-contractors) seemed to know the most about what they were doing and also helped me take temporary measures to stop the leak. When they came back to perform the job they were very quick, clean and professional. This included replacing the interior and exterior wall penetration, meter box, main feed cable and some pieces on the circuit breaker panel. They also dealt with the town for permits and the electric company for pulling the box. Overall they did exactly what they said for the price that they quoted and I was very pleased with their service. I also used two of the Angie's List "BigDeal" coupons, which they handled without any problems. I would definitely recommend them to others.
"
Before
After's
New boiler install
Removal of cast Iron to PVC.
Additional Photos

+37

Recommended by89%of homeowners
Solar Panels questions, answered by experts

You shouldn’t hook up a solar panel directly to a battery. That can damage the solar battery and your appliances over time. Instead, install a charge controller between your solar panel and solar battery. Charge controllers regulate voltage, prevent overcharging, and minimize the amount of electrical current to protect your battery from voltage spikes.

The actual time it takes to construct the solar farm is relatively short, taking between 2 and 4 months on average. That timeline is dependent on site conditions, crew size, and the overall size of the solar farm.

However, the time it takes to get the ball rolling is significantly longer, ranging from 3 to 5 years. With a project of this scale, you’ll need to obtain all of the proper permits and approvals to start breaking ground, and depending on your location, that could be an extended process.

Yes, going solar really saves money. In fact, according to some calculations, the average homeowner who switches from electric to solar power will save almost $2,000 a year on energy costs. While buying solar panels and switching to solar can be costly up front, the savings add up over time. If you can sell back extra energy or take advantage of tax incentives, your savings can be even higher.

It’s possible that installing solar panels can lead to mold on the roof. The panels themselves are not the issue. Problems caused by improper installation—such as roof leaks and mounts that aren’t sealed properly—can cause mold. Another potential cause of mold is debris accumulation under panels, which can trap moisture. If you live somewhere with extreme snow, rain, or hail, your home could be more prone to mold.

Professionals use the same methods to install solar shingles that they do for asphalt shingles, so you’ll often see a similar installation timeline of one to two days. The amount of time required will depend on the size and slope of your roof and the number of shingles installed. Weather conditions can delay installation, as working on a roof is unsafe during high winds or heavy rain.

The Hancock, ME homeowners’ guide to solar panel services

From average costs to expert advice, get all the answers you need to get your job done.