Top-rated subcontractors.

Get matched with top subcontractors in Dover Foxcroft, ME

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Dover Foxcroft, ME?

Select your specific project to find the pro for you.

TRUSTED BY DOVER FOXCROFT, ME HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon63
    Verified subcontracting services reviews

Find Subcontractors in Dover Foxcroft

Avatar for Tejada's Remodeling Inc
Tejada's Remodeling Inc
4.7(
31
)
Major Home Repairs (General Contractor)

Serving Dover Foxcroft, ME and surrounding areas

Approved

Super Service Award Winner

In business since 2024

Free estimates

Warranties offered

"Highly recommended. Jose and Cesar were great. They were reliable and their work was excellent. They completely remodeled our condo including 4 bathrooms, floors, fireplace/hearth, etc. It was a big job and they worked with us to make sure everything came out exactly the way we wanted. The cost was very reasonable."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+6

Response time2 days
Response rate100%
9 neighbors recently requested a quote
Avatar for New England Home Renovations LLC
New England Home Renovations LLC
4.0(
311
)
Major Home Repairs (General Contractor)

Serving Dover Foxcroft, ME and surrounding areas

In business since 1983

Free estimates

Emergency services offered

"Everything went wonderfully with this company.  They were very professional, listened to exactly what my problem was, and explained to me how they were going to diagnose the problem and/or solve it before doing any actual work.  Once they started, the team (three people came) worked together like a well-oiled machine.  One was in the room with diagnostics, one was at the fuse box looking for possible problems there, and the third went into the crawlspace beneath our house to look at the physical wiring.  Once the problem was found (there was a faulty wire beneath the house that had come loose from the junction box), it was fixed and tested within minutes and another full diagnostic was done to make sure there were no other possible issues.  They cleaned up after themselves very neatly.  They also replaced the light switch with a dimmer switch at no extra cost!  Well within my budget, and came in even lower than their original (FREE) estimate!  I would highly recommend this company to anyone in the Bergen County area.
"
Before
After's
New boiler install
Removal of cast Iron to PVC.
Additional Photos

+37

Recommended by89%of homeowners
Avatar for Aqua Terra Blasting
Aqua Terra Blasting
5.0(
7
)
Major Home Repairs (General Contractor)

Serving Dover Foxcroft, ME and surrounding areas

In business since 2017

Free estimates

Emergency services offered

"Andy did an excellent job of cleaning 20 years of bottom paint off the bottom of my 21 foot fiberglass boat. Paint was removed to the boot stripe and there was no damage to the glass. The work was completed in my yard which was left clean with no residue. Great job"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+14

Recommended by100%of homeowners
Showing 1-10 of 46
Subcontractors questions, answered by experts

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

Blueprints are generally available for houses built after the early 1900s. Before then, detailed building schematics like blueprints were rarely used and even more rarely saved. If you have an older house and need blueprints, you can have a new set drawn up by an architect or draftsperson.

Designing a building takes 2-6 months, depending on project size, required permits, and revisions.

The process typically takes 2-6 weeks, depending on the project size and level of customization.

Buying a house is easier than building one from scratch. Buying an existing home is almost always faster, even if you need to make renovations once you move in. When you hire the right team to build a home, they will simplify the design and build phases so that there is little guesswork throughout the process, but building new construction will almost always take longer than buying an existing home.

The Dover Foxcroft, ME homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.