Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Castine, ME

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Castine, ME?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Castine

Avatar for Resonant Landscapes
Resonant Landscapes
5.0(
3
)

Serving Castine, ME and surrounding areas

Approved

In business since 2023

Free estimates

Warranties offered

"Resonant thinned out the trees in the woods and planted new trees and bushes around our house. They are in the process of putting in pavers to our front door with a great eye for design. Enjoyable to work with as we discuss ideas and see them brought to completion. We highly recommend them."
Layout pre-cuts
Drain cover stone
Full color w/ cleft
Exavation
Driveway

+25

Response rate100%
24 neighbors recently requested a quote
Avatar for D&D Earthworks
D&D Earthworks
5.0(
2
)

Serving Castine, ME and surrounding areas

Approved

In business since 2021

Free estimates

Credit card accepted

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer’s needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.\n

Septic system
Septic system
Response time4 days
4 neighbors recently requested a quote
Avatar for Bear Claw Land Clearing
Bear Claw Land Clearing
5.0(
1
)

Serving Castine, ME and surrounding areas

Approved

In business since 2019

Free estimates

Emergency services offered

"Can’t say enough good things about this contractor! Very competitive quote, Work was completed just as I envisioned. Very careful about not damaging the grass and vegetation around the job site. I highly recommend him!"
Driveway grading
Driveway grading
Driveway grading
Driveway grading
Driveway grading

+1

3 neighbors recently requested a quote
Avatar for Newman's Ground Effects
Newman's Ground Effects
New to Angi

Serving Castine, ME and surrounding areas

Approved

In business since 2013

Free estimates

Credit card accepted

Newman's Ground Effects is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customer's interests and make their concerns the basis of our business. Please give us a call today!

Line Striping
Line Striping
Line Striping
Response time1 day
...
Showing 1-10 of 57
Asphalt Driveways questions, answered by experts

A driveway's lifespan varies by material. Asphalt driveways typically last 15 to 30 years, while concrete driveways last longer, between 20 and 50 years. The longevity of any driveway is affected by factors like extreme temperatures, heavy traffic, and the quality of maintenance. Regular upkeep, such as filling cracks, resealing the surface, and ensuring proper drainage, can help extend its life. For gravel driveways, regrading to fill in uneven areas every year or two is recommended.

Many asphalt companies have experience with tar and chip paving, but not all. The process is unique enough—and not incredibly common enough—that you may have to look around for a tar and chip specialist. However, speaking with a driveway company is a great place to start, especially if they have experience with multiple materials.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

Think of the street as a way to capture all the elements on either side of the road, including the road—a street encompasses the homes or other buildings, the trees, and the road of a given area as defined by the beginning and end of the street on a map. A roadway, however, is the component of the street where cars travel.

Whether you should resurface or replace your asphalt driveway heavily depends on its condition. If the foundation is solid and the damage is minor, resurfacing is your best bet because it’s more affordable and faster than replacing the driveway. But if your driveway has foundational problems and/or severe damage, like large, deep cracks and potholes, then it makes more sense to replace it. 

The Castine, ME homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.