Top-rated pole barn builders.

Get matched with top pole barn builders in Buxton, ME

Enter your zip and get matched with up to 5 pros

Need a pro for your pole barn building project in Buxton, ME?

Select your specific project to find the pro for you.

TRUSTED BY BUXTON, ME HOMEOWNERS

  • Average homeowner rating star icon4.1
    Average homeowner rating
  • Verified reviews icon42
    Verified pole barn building services reviews

Find Pole barn builders in Buxton

Avatar for Clark Handyman & Carpentry
Clark Handyman & Carpentry
5.0(
22
)
Shed, Barn or Playhouse - Repair

Serving Buxton, ME and surrounding areas

Approved

In business since 2018

Free estimates

Offers commercial services

"We had shelves installed in our coat closet to turn it into a pantry, and Brian Clark did a great job. He made sure he understood exactly what we wanted before starting, worked professionally, and was prompt and efficient. We’re very happy with the results and would definitely recommend him."
Response time3 days
10 neighbors recently requested a quote
Recommended by57%of homeowners
Avatar for 506 Designs & Carpentry LLC
506 Designs & Carpentry LLC
4.4(
7
)
Shed, Barn or Playhouse - Repair

Serving Buxton, ME and surrounding areas

Approved

Free estimates

Emergency services offered

"Brendon replaced my kitchen subfloors and put a new linoleum, full trim all the way around, a bathroom bifold, and even put a special touch to the trim, so I'd think of my late farther who had worked in that same kitchen many moons ago. Brendon had some challenges with old school techniques, but worked long and hard to end with flooring, trim and doorway that was beautiful and I was pleased with the outcome."
40 neighbors recently requested a quote
Avatar for Kelsey Thatcher
Kelsey Thatcher
New to Angi
Shed, Barn or Playhouse - Repair

Serving Buxton, ME and surrounding areas

Approved

Free estimates

Small jobs welcome

I take pride in delivering quality craftsmanship with honesty, reliability, and attention to detail. Whether you need trim work, framing, decks, repairs, or custom carpentry, I approach every project as if I were working on my own home.\n\nClear communication, dependable service, and lasting results are at the heart of everything I do. My goal is to provide high-quality workmanship at a fair price while ensuring every customer is satisfied from start to finish.\n\nIf you're looking for a carpenter who shows up on time, works hard, and takes pride in every cut, I'd be happy to help bring your project to life.

Andrey Klokov
New to Angi
Shed, Barn or Playhouse - Repair

Serving Buxton, ME and surrounding areas

Approved

I Have been a carpenter for over 5 years with experience working on residential and commercial cites. Past work includes carpentry framing, additions and remodels. I have great experience in finish trim work, decking and railings. Based out of Scarborough, but will travel up to an hour. I take pride in my work, love to learn new things and want to help people. That’s why I believe I can help you with your home needs.

...
Showing 1-10 of 107
Pole Barn Builders questions, answered by experts

The most common slope, or roof pitch, for a shed is 4:12 or four inches of height for every horizontal foot. For areas that experience heavy snow loads, a steeper roof of 6:12 or 9:12 is best. 

Rather than using a common two-by-four piece of wood for a rafter, you probably will use two-by-six, two-by-eight, two-by-ten, or even two-by-twelve boards. Wider lumber is typically a better choice in a larger building as it provides more sturdiness. Some installers may use wider lumber for rafters near the edges of the roof, where the greatest stress occurs, and save money with narrower lumber toward the middle.

The time it takes to build a shed heavily depends on the type of shed you buy. A prefab shed can be built in 4 to 8 hours, while a custom shed will be built off-site over the span of 2 to 5 days. It then takes a few hours, depending on the location, to move the finished shed to its final location.

The construction stage is almost always the longest part of building a house. Within this stage, framing often takes the most time, lasting anywhere from one week to a couple of months, depending on the home's size, the crew, and the time of year. Other parts of the construction phase include pouring the foundation and installing doors, windows, a roof, siding, drywall, and flooring. The planning and design phase can also be very time-consuming, sometimes taking months or even years, especially for a custom home. The final finishing process, which includes painting and installing trim, is typically shorter than the construction or planning stages.

Pole barns and carports are similar in that they rely on posts for support and are often not connected to a primary structure. The main difference between the two is that pole barns usually include walls that surround the entire perimeter of the structure, while carports generally remain open on three or four sides. It’s possible to insulate garage doors and even exterior walls on pole barns to create a comfortable workspace, and it’s a bit more secure for storage purposes. However, carports are more affordable.

The Buxton, ME homeowners’ guide to pole barn building services

From average costs to expert advice, get all the answers you need to get your job done.

  • Farm blue barn shed and gravel driveway.

    If you’ve ever wondered what precisely a pole barn is, you’re about to find out. Not many know the advantages and disadvantages to the cost, construction style, and flexibility of building one on your own or hiring a contractor for the job.

  • framework of building a farm

    Learn how to hire a barn builder with expert guidance on finding qualified pros, asking the right questions, and ensuring your barn project succeeds.