Top-rated rototilling pros.

Get matched with top rototilling pros in Franklin, LA

Enter your zip and get matched with up to 5 pros

Need a pro for your rototilling project in Franklin, LA?

Select your specific project to find the pro for you.

Find Rototilling pros in Franklin

No results for Rototilling pro in

Try adjusting your search criteria.
Rototilling questions, answered by experts

Yes, such as sod installation and erosion control for comprehensive site improvement.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

Fixing a depression in your lawn is a DIY for small dips, divots, or slight slopes. You can either remove sod and earth to lower the uneven ground or add premixed topsoil and reseed the lawn to raise it. You can also hire a yard grading company near you for professional help.

Ensures proper drainage and ground stability, preventing soil erosion and foundation issues.

A perc test takes an average of around two hours, but it can range from one hour up to around six hours. Perc tests that require wider or deeper holes and those that require multiple holes dug throughout your property will take longer because there’s more excavation involved. The actual filling of the hole and monitoring to gauge the rate of percolation should take under an hour per hole.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.