Top-rated rototilling pros.

Get matched with top rototilling pros in Albany, KY

Enter your zip and get matched with up to 5 pros

Need a pro for your rototilling project in Albany, KY?

Select your specific project to find the pro for you.

Find Rototilling pros in Albany

Avatar for L & C Mower Parts

L & C Mower Parts

No reviews yet

L & C Mower Parts

No reviews yet
16 years of experience

L & C is a family operated small business in the industry of outdoor power equipment sales and service. We service most makes of 2 & 4 stroke gas powered lawn mowers, chain saws, grass trimmers, etc. We also service propane powered equipment in the outdoor power industry. L & C has a minimum of TWO master certified technicians on duty

L & C is a family operated small business in the industry of outdoor power equipment sales and service. We service most makes of 2 & 4 stroke gas powered lawn mowers, chain saws, grass trimmers, etc. We also service propane powered equipment in the outdoor power industry. L & C has a minimum of TWO master certified technicians on duty

Rototilling questions, answered by experts

When leveling the ground for a pool. If the ground is mostly level, you may be able to simply lay down pavers or pool pads to support the pool. However, you’ll still need to level the ground with sand as a base before adding other materials on top, like crushed gravel.

Not typically. A paver patio drainage problem generally requires a landscaping fix that can include a drainage pipe or dry well capable of handling the amount of runoff in your yard.

Periodic checks for erosion and proper drainage function ensure lasting results.

It depends on the model of your pool. You’ll always have to level the topsoil, but most vinyl-lined pools require an additional 1- to 2-inch layer of sand to protect the liner. This way, when a foot kicks down to the bottom of your pool, it’s not scraping the liner against the hard ground. If your pool isn’t vinyl-lined, you can skip this step or add a layer of another base material, like decomposed granite. Always check your manufacturer’s instructions before you begin.

A perc test takes an average of around two hours, but it can range from one hour up to around six hours. Perc tests that require wider or deeper holes and those that require multiple holes dug throughout your property will take longer because there’s more excavation involved. The actual filling of the hole and monitoring to gauge the rate of percolation should take under an hour per hole.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.