"Isaac completed several projects for me in the last 6 months. Including painting and installing vinyl luxury flooring in 2 rooms, installing a storm door, weeding & mulching, fence post repair for privacy fence; removal of split rail fence and install of no maintenance picket fence, installing of outside Christmas lights, and install of insulation and pegboard walls in garage.
He was very good about communicating on the jobs. He showed up when he said he would and would text if there was a delay. After the various jobs were completed, he followed up to make sure I was satisfied. I have referred him to friends who were also pleased- he installed a privacy fence for them."
My name is Rudy and I am the owner and operator for Rudy’s Paint and Handyman. I have been in the painting and handyman business for over 35 years because I provide great customer service and will treat your family and home with great respect. I have a high attention to detail to make sure that every job gets done properly and to your satisfaction. I was a professional painter at Purdue University for over 20 years painting various buildings on campus before opening up my own business. I know that I can provide the same level of quality work at your home or office. I look forward to working with you on your next project.
"After receiving a few other estimates on a sunroom addition plus a screened in porch, we decided to go with Legacy Windows. Mark’s estimate was in the middle of the other estimates and he offered much more flexibility than the other companies we spoke to in terms of customization. He is a great salesman with previous marketing experience. We signed our contract on April 10th. We were told that Mark and his crew were finishing a room and would be able to start in 2-3 weeks with a timeframe of 6-8 weeks for completion of our room addition project. The budget and timeframe worked well for us, so we decided to add replacement windows for the rest of our house (11 windows total). Several weeks went by and our project had not yet started so we followed up with Mark. We were told that there were issues with his current project (did not pass inspection) and it would push our start date back due to the workmanship repairs. During this time period before any work began on our project we would communicate often with Mark to check on the status of our project. The really frustrating thing about working with Mark is his inability to fulfill commitments he would make to us in regards to project timing and when things would be done. Our primary communication with him was via text messages and time after time he would tell us, “we should be starting next week” or “we are going to be making up for lost time quickly” and time would pass and it just wouldn’t happen. Work on our project began when our existing windows were replaced in early June. The foundation for the expansion was finally started in late June and framing started in early July (roughly 3 months after signing the contract). The first crew completed the framing, hired the shingles out, installed some of the cedar siding, and installed one wall of windows. We were seeing decent progress after having such a long wait in the beginning, all the while the commitment issue just kept popping up. We would get a text saying something like, “going to be at the house tomorrow with some stone samples” and he wouldn’t show up. It was annoying, but progress was being made and we were happy with how the expansion was taking shape so we were willing to overlook it. Sometime toward the beginning of August (roughly 4 months after signing the contract), work just stopped. Again, when we would reach out to Mark asking about the status of our project we would be told, “I’ll have an action plan later this afternoon” or “we want to get everything we done we can this week” or “the crew will be there tomorrow and we will be working all week on your project trying to finish”. In the meantime, nothing would be done and we would repeat the process. This went on for over 3 weeks, during this time there was absolutely no work done. Large piles of construction trash and building materials sat in our yard during this time. A great deal of the usable wood began to warp and I am sure that ultimately materials had to be tossed from being left in the elements for so long. After a couple weeks I finally moved a significant portion of the usable wood up onto the deck so it would at least be partially protected. We found out that there was an issue with the electrical and Mark had decided to let Crew #1 go as they were not meeting his expectations, but it was not communicated to us until the end of the over 3 week period. A second crew then arrived who Mark said usually only did work for him on the south side of Indy (we live in Lebanon), but he wanted to get our project back on track. There seemed to be little to no communication between the crew and Mark on what they were supposed to work on so we had to explain to them what was in the contract to be completed. Crew #2 also started making good progress, they finished the cedar siding, got the rest of the windows installed in the sunroom as well as installing the sunroom ceiling. About this time, which was at the beginning of September we had a separate crew come out to do the drywall. Mark recommended them very highly. As it turned out, the drywall was not properly installed or insulated (in some walls there was no insulation), and ultimately it had to be taken down and redone by Crew #2. Crew #2 seemed to be doing a really good job and we were quite pleased with their progress and the quality of work they were doing for us. They were replaced by Crew #3 sometime in mid-September. We were never told why they were replaced, but Crew #3 was much closer to where we lived so I assume that had something to do with it. Much like when Crew #2 started, there seemed to be little communication between Crew #3 and Mark on what they were supposed to work on. So we again had to explain what was in the contract to be completed. All through the process, the commitment issues mentioned previously continued. We were not as happy with the quality of the work done by Crew #3 as we had been by Crew #2 (or even Crew #1), but they did finally complete for the project for us and after (3) failed attempts we finally received a pass from the building inspector on his final inspection. When Crew #3 decided they were finished they never came back, we communicated multiple times with Mark about the remaining punch list items to no avail and ultimately decided to finish most of the small punch list items ourselves instead of waiting any longer for them to finish (clean up, sanding / finishing drywall, etc.). We love the way the sunroom and covered porch area turned out. From contract signing until the end it took a little over six months, but in Mark’s defense he did agree to let us add a brand new window in the dining room of our house to tie everything together at no cost to us as appreciation for our patience. There are things that we liked about Mark’s company and things we didn’t, I have tried to summarize each category as follows: Positives • Price seemed reasonable • It is truly a custom build, no problem with changes we had at any point • Love the way it turned out, looks amazing • Mark seemed to genuinely care about the quality of the product he was delivering to us (he replaced the cedar shakes that had been installed by Crew #1 because he wasn’t happy with the quality Negatives • Our project seldom felt like it was a priority, part of the reason it took so long was because they were over committed on other projects • Commitment Issues (addressed previously) • Construction Trash left in our yard for months • We cleaned up inside more than they did, I understand drywall work is messy. They never swept up any of the dust and they didn’t clean up any of the clumps of dried drywall mud all over the floor. • We finished some of the minor punch list items, just to be done."
2017 SUPER SERVICE AWARD WINNER IN WINDOWS IN THE INDIANAPOLIS AREA!!! Services offered now include bathroom and kitchen remodels, custom mfg replacement windows,entry/patio doors,insulated siding, sunrooms, roofing,insulation, gutters. Barrier window is a direct factory outlet and provides installation with all products. All products installed by Barrier come with a Lifetime non-prorated warranty and is owner transferable. Barrier Window Inc was established in 1996.
No matter what you need done I'm the one that can do it all! Years of hands on experience with just about everything from you family's home to mechanical work to you automobiles! There is no job to small and every task performed is backed with a 1 year warranty! I like to come up with an agreement with the customer on a price. When I start a job I finish it before starting anything else. I have let homeowners make payments before the labor is done for bigger jobs like a new roof. I like to help people out by not charging crazy prices. I'm your right hand hangman honest and reliable.
“WE” are a Very Reliable & Professional Company that provides our restoration services in Indiana, Georgia, and throughout the continental US. We have over a decade of industry-leading experience. Our highly trained professionals have the tools and knowledge necessary to get your property looking like new again. The services we provide are Pressure Washing, Window Cleaning, Gutter Cleaning and Dryer Vent Cleaning. Our restoration specialists can carefully inspect your property and can create customized solutions for you. With our services, you can rest assured you have a trusted team ready to help you whenever you most need them. We possess the knowledge and tools to get the job done right the first time. This way, you can focus on what matters most to you! We offer Seniors and Veterans Discounts of 10% off.
Our business consists of everything to do with construction. We build additions to new homes. Remodels, decks, siding, roofing, and more. If it is not listed just reach out to us and I am sure we can complete your project. You can view some of our previous projects on Facebook. Research 7M Construction out of Veedersburg, IN. There is not a job to big or to small.
"The toilet needed to be replaced. I was told that I would only get the builder standard grade toilet even though I was signed up with the highest plan. The plumber was replaced my toilet with something that was definitely builder grade and not even close to what I had. I called CHOICE and they told me that it should have been replaced with something comparable to what I had. Twice they told me they were going to have my claim looked at and I have not received a call about it or any new information. The new toilet is wrong in size and specs and doesn't fit well where it is in the bathroom."
It’s much less expensive to build a house with wood. This is because wood is relatively inexpensive, strong enough to endure decades or even centuries of weathering and pressure, and is easier to replace if there are issues. The cost of stone houses are incredibly expensive, heavy, time-consuming to build, and difficult to repair.
Barns and barndominiums are most commonly painted red, like barns depicted in movies and paintings. The practice of painting barns red dates back to America’s colonial days, when new farmers would borrow the European practice of mixing linseed oil with ferrous oxide to coat the barns in order to protect them from the elements, leaving the structures with a red color.
A steel frame costs 10% to 20% more than a wood frame. Wood is a much easier material to work with, more accessible, and generally more affordable than steel—plus, you need specialized tools to work with steel.
The lifespan of a barn is typically 40 to 60 years, but with skillful construction and proper maintenance, it can last up to 100 years. The actual lifespan depends on several factors, including the barn type, materials, usage, and climate. For example, the posts of a pole barn should last 50 years or longer, but if the structure is used for livestock in a rainy climate, it may rot within the first decade. Custom designs with high-end materials tend to last the longest. To get the best estimate for your barn's lifespan, you should consider its material type and intended use.
Rustic and modern farmhouse styles are currently the most popular. These include rustic and antique furniture, muted colors, clean lines, eclectic decor, and natural materials. Some other popular farmhouse styles include the following:
Coastal farmhouse: Creates a lighter, airier feel with soft colors and blue palettes, along with gold
Colonial farmhouse: Focuses on real antique furniture and decor
French farmhouse: Leans on French country architecture and design by including marble and lighter-colored metals, like zinc
Industrial farmhouse: Includes thick, chunky furniture and dark metals
Scandinavian farmhouse: Usually includes lighter wood colors and more refined furniture
The Boswell, IN homeowners’ guide to pole barn building services
From average costs to expert advice, get all the answers you need to get your job done.
Get expert insights on barn roof repair cost, including average prices, cost factors, and ways to save. Learn what impacts your barn roof repair cost and how to budget.
If you’ve ever wondered what precisely a pole barn is, you’re about to find out. Not many know the advantages and disadvantages to the cost, construction style, and flexibility of building one on your own or hiring a contractor for the job.
Which pole barn foundation option is best for your area and the size of the pole barn you’re building? Check out five of the most commonly used options.