Top-rated rototilling pros.

Get matched with top rototilling pros in Wayne City, IL

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Wayne City, IL?

Select your specific project to find the pro for you.

Find Rototilling pros in Wayne City


Avatar for Sears Hometown Store - Macomb

Sears Hometown Store - Macomb

No reviews yet

Sears Hometown Store - Macomb

No reviews yet
32 years of experience

Sears Hometown and Outlet Stores Inc (“SHO”) is a national retailer primarily focused on selling home appliances, hardware, tools, and lawn and garden equipment. We operate through two segments - the Sears Hometown, Hardware and Showroom segment (“Hometown”) and the Sears Outlet segment (“Outlet”). Our Hometown stores are designed to provide our customers with in-store and online access to a wide selection of national brands of home appliances, tools, lawn and garden equipment, sporting goods, consumer electronics and household goods, depending on the particular store. Our Outlet stores are designed to provide our customers with in-store and online access to new, one-of-a-kind, out-of-carton, discontinued, obsolete, used, reconditioned, overstocked, scratched and dented products across a broad assortment of merchandise categories, including home appliances, lawn and garden equipment, apparel, mattresses, sporting goods, tools, and consumer electronics at prices that are significantly lower than manufacturers’ suggested retail prices. As of October 27, 2012, we and our dealer stores and franchisees operated 1,237 stores across all 50 states as well as Puerto Rico, Guam and Bermuda. Store number - 3099. Owned & operated by Chris Jacques.

Sears Hometown and Outlet Stores Inc (“SHO”) is a national retailer primarily focused on selling home appliances, hardware, tools, and lawn and garden equipment. We operate through two segments - the Sears Hometown, Hardware and Showroom segment (“Hometown”) and the Sears Outlet segment (“Outlet”). Our Hometown stores are designed to provide our customers with in-store and online access to a wide selection of national brands of home appliances, tools, lawn and garden equipment, sporting goods, consumer electronics and household goods, depending on the particular store. Our Outlet stores are designed to provide our customers with in-store and online access to new, one-of-a-kind, out-of-carton, discontinued, obsolete, used, reconditioned, overstocked, scratched and dented products across a broad assortment of merchandise categories, including home appliances, lawn and garden equipment, apparel, mattresses, sporting goods, tools, and consumer electronics at prices that are significantly lower than manufacturers’ suggested retail prices. As of October 27, 2012, we and our dealer stores and franchisees operated 1,237 stores across all 50 states as well as Puerto Rico, Guam and Bermuda. Store number - 3099. Owned & operated by Chris Jacques.


Rototilling questions, answered by experts

Yard grading is a key component of proper drainage because runoff naturally moves with respect to gravity. If you have low spots in your yard, rain and snowmelt will settle there and oversaturate the soil, promoting root rot and fungal growth. If the low spots are near your home’s foundation, you could even end up with foundation leaks or structural damage due to poor yard grading.

Yes, it’s always a good idea to fertilize your lawn before a major leveling project. This step gives your grass the nutrients necessary for healthy growth, helping it recover and replenish itself faster. However, you should do this at least three weeks in advance, as the leveling process can disturb the newly-applied fertilizer.

Professionals who complete perc tests can usually do them in a single day. Including excavating to expose the test site, filling the hole with water, and monitoring it while it drains, you can expect the test to take between four and eight hours total. It’s possible that you’ll get the results the same day, but some companies may take a few days to get official results.

Typically 1-3 days, depending on property size and terrain condition.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"