Top-rated generator install pros.

Get matched with top generator install pros in Mount Sterling, IL

Enter your zip and get matched with up to 5 pros

Need a pro for your generator install project in Mount Sterling, IL?

Select your specific project to find the pro for you.

Find Generator install pros in Mount Sterling

Avatar for Shumaker Electric, LLC
Shumaker Electric, LLC
4.8(
8
)
Fixed Generator - InstallFixed Generator - RepairGenerator - Install - For Business+1 more

Serving Mount Sterling, IL and surrounding areas

Approved

In business since 2023

Free estimates

Emergency services offered

"Job: install fan and switch for it in spot with no electrical box yet. 1 hr 56 min arrival to departure. Pros: Called me the next day after reaching out through Angie. Friendly to talk to during booking and while working at the house. The work went well nstalling the ceiling fan and a switch for it where one wasn't. Cons: Never quoted job (figured it couldn't be that bad for a fan install so didn't ask - big mistake) and appointment was a month out for 7:30am on a Friday. Informed them I worked nights at the time of booking. They text me at 6am that day to inform they'd ould be late and arrived at 9:46a (I'm 25 hrs awake at the point they arrive). Invoice for $737 comes across. Inquired about the $300 for labor for one and $375 for labor for the other and was told "We usually charge round trip, and I only charged you one way. And there was no existing switch or fan location,if it was as simple as just changing a fan out there would have only been one". Double labor charge unfair."
My jobs
My jobs
My jobs
My jobs
My jobs

+6

Response time1 day
Response rate100%
2 neighbors recently requested a quote
Generator Install questions, answered by experts

The average cost to install a home generator is $5,200, but total costs can range from $500 to $18,000 or more. The final price depends on several factors, including the generator's size, type, brand, fuel source, and the cost of labor and assembly. The generator's size is the most significant cost factor, as units that can power larger homes with higher energy demands cost more.

Cost breakdowns by generator type are typically as follows:

  • Portable or Emergency Backup Generators (1kW–7.5kW): $500–$2,000

  • Partial-Home Generators (9kW–20kW): $2,000–$6,500

  • Whole-House Generators (22kW–48kW): $5,000–$18,000

To ensure you get the right size unit for your needs without overpaying, consider hiring an electrician to calculate the electrical load of your essential appliances. It is also recommended to get at least three quotes from qualified installers to find the best fit for your budget.

Yes, in some locations, it is required by the National Electric Code (NEC) to have a transfer switch installed for electrical emergencies. In addition to following electrical code, generator transfer switches ensure your home is fully protected during a power outage. By switching the power from the main breaker to the generator breaker, you can seamlessly operate your HVAC, lights, appliances, devices, and more during an emergency. 

While the rating will tell you how many watts the refrigerator needs at the peak of its cycle, it requires additional wattage to start. At the bare minimum, you’ll need a 1,500-watt generator to get the fridge up and running after a blackout. A 2,000-watt generator should be sufficient for most home refrigerators.

Setting up utilities on a vacant property usually takes at least a few months, or between 6 weeks to 16 weeks. This process requires working with the local planning and zoning department, hiring a building contractor or engineer to design the utility layout, securing permits, laying the lines, and connecting the utilities.

In most municipalities, you will need a permit to install a permanent home generator, including emergency backup, partial-home, and whole-home generators. A permit for a generator usually costs between $50 and $250, depending on where you live. Your electrician or certified generator installer will usually pull the permit for you—and might be required to do so by your building department—but you’ll be on the hook for the cost of the permit. You should ask your installer before agreeing to any work if they will pull the necessary permits for your project.

The Mount Sterling, IL homeowners’ guide to generator installs

From average costs to expert advice, get all the answers you need to get your job done.