Get matched with top subcontractors in Anna, IL

Anna homeowners rate subcontractors in our network

4.4

(45 reviews)

Top-rated subcontractors.

Need a pro for your subcontracting project in Anna, IL?

Select your specific project to find the pro for you.

Find Subcontractors in Anna

Avatar for Dunaway Construction
Dunaway Construction
5.0(
5
)

Serving Anna, IL and surrounding areas

Approved

In business since 2002

Free estimates

Customers say: Quick response

"Lee showed up on time at my old cabin to go over project and was there when he said that he was going to be there to demo old cabin.he was professional and did it for a fair price !"
Response time3 days
Recommended by100%of homeowners
TNT Turnover Services
New to Angi

Serving Anna, IL and surrounding areas

Approved

TNT Turnover Services isn’t just remodeling spaces—we’re transforming them.\n\nWe take outdated, worn, or underperforming areas and turn them into clean, modern, high-impact spaces built to impress and made to last. From kitchens and bathrooms to full property turnovers, our work is driven by precision, quality craftsmanship, and attention to every detail.\n\nAt TNT Turnover Services, we don’t believe in shortcuts—we believe in results. We bring reliability, speed, and professionalism to every project, delivering a smooth, hassle-free experience from start to finish. On time. On budget. Done right.\n\nWhether you’re upgrading your home or preparing a property for its next chapter, we’re here to raise the standard and exceed expectations.

1 neighbors recently requested a quote
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)

Serving Anna, IL and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for Anderson & Son's Construction
Anderson & Son's Construction
4.4(
8
)

Serving Anna, IL and surrounding areas

In business since 2014

Free estimates

Warranties offered

"A very responsible and reliable team. Quick responses and very fair, professional and effective. The Anderson's can do it all... from the small jobs to the major repairs and upgrades. I just moved again and lost their number; they contacted me immediately thereafter. Good people. Honest, hard-working and fair.Highly recommended."
bedroom 2 before
bedroom 3 before
bathroom before
bedroom 1 before
hallway before

+66

Response time2 days
Recommended by85%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Anna, IL and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 34
Subcontractors questions, answered by experts

You have three options in terms of professionals who can draw up blueprints: a draftsperson, an architect, or a structural engineer. A draftsperson can sometimes draw up plans for new construction, but they more often work from approved plans for alterations or to provide 3D drawings. Architects are usually the best option for standard residential construction projects. Structural engineers might be necessary for custom home builds or for alterations that could affect your home’s structural integrity. Draftsmen cost the least of the three, followed by architects and then structural engineers.

An architect is usually involved in the process of determining the layout and structural features and requirements of the home itself, taking into account the local codes, climate, and materials needed to make the home structurally sound. Architects may communicate more with contractors and subcontractors throughout the building process. In comparison to architects, interior designers typically focus on the aesthetics of a home interior and possibly exterior, helping the homeowner decide on color schemes, textures, and materials to incorporate into the design. 

Yes, pros can offer guidance to achieve desired aesthetics and match existing decor.

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

The average build timeline for a home is between six and 12 months, with timelines pushing toward the upper end of that range if you’re creating a custom design or need a lot of land preparation before getting started. Hiring a general contractor or a custom homebuilder will help speed up the process, as you’ll see fewer delays between different parts of the build process getting done.

The Anna, IL homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.