Top-rated driveway sealcoating pros.

Get matched with top driveway sealcoating pros in Ely, IA

Enter your zip and get matched with up to 5 pros

Need a pro for your driveway sealcoating project in Ely, IA?

Select your specific project to find the pro for you.

TRUSTED BY ELY, IA HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon44
    Verified driveway sealcoating reviews

Find Driveway sealcoating pros in Ely

P&S Asphalt sealcoating & General home repair
New to Angi
Asphalt Sealing

Serving Ely, IA and surrounding areas

In business since 2014

Free estimates

Are there projects lingering in the back of your mind that you just don't have the time or ability to tackle? Wanting to get a fair price for the work that you are desperate to get done? Well, help is on the way. Our business is dedicated to providing property owners with professional home repair. Contact us for anything from Sealcoating to flooring repair. We are ready and able to help you check that pesky task off your "to-do" list! \n

Showing 1-10 of 12
Driveway Sealcoating questions, answered by experts

Chip seal roads and driveways are slightly more expensive than gravel, but significantly more affordable than traditional asphalt. Chip seal works wonders when used as a top coat. Its lighter color is less heat-absorbant than black asphalt. It also renews your aging, deteriorating asphalt without having to spend on major repairs or redoing the entire driveway.

It depends on the type of sealer. Some sealers can dry in as little as 4 hours, but many can take up to 48 hours to fully cure. To play it safe, don’t drive on your driveway for two days after sealing.

Many services include sealing as part of the repair process. Confirm with your contractor.

Yes, most services include sealing to protect the finish and enhance durability. Confirm with your provider.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Ely, IA homeowners’ guide to driveway sealcoating

From average costs to expert advice, get all the answers you need to get your job done.