Top-rated mulch and topsoil pros.

Get matched with top mulch and topsoil pros in Edison, GA

There are 0 highly-rated local mulch and topsoil pros.

Need a pro for your mulch and topsoil service project in Edison, GA?

Select your specific project to find the pro for you.

Find Mulch and topsoil pros in Edison






JJV Rubber Mulch and Safe Rock LLC

98 W Arion Street
No reviews yet

JJV Rubber Mulch and Safe Rock LLC

98 W Arion Street
No reviews yet
21 years of experience

JJV Rubber Mulch and Safe Rock, stands poised and proud by providing rubber mulch products that utilizes NON-TIRE recycled rubber in the production process. JJV Rubber Mulch continues to offer a safe and clean alternative.

JJV Rubber Mulch and Safe Rock, stands poised and proud by providing rubber mulch products that utilizes NON-TIRE recycled rubber in the production process. JJV Rubber Mulch continues to offer a safe and clean alternative.

Mulch and Topsoil questions, answered by experts

The time that it takes to fill in a pool with dirt varies based on the size of the pool and the equipment you have available. Using heavy equipment, like an excavator rather than a shovel, will significantly cut down on the time it takes to complete the project. With the right equipment, it may only take a day or two. However, after the initial filling, the dirt will continue to settle over the following weeks and months. You may need to add more dirt to make the empty area level with the rest of the yard.

Basic kits exist, but professional soil engineers provide in-depth analysis and construction recommendations.

A 50-pound bag of pea gravel equals approximately one-half of a cubic foot. That amount will cover a three-square-foot area to a depth of about two inches. A three-square-foot area with equal-length sides is approximately 1.73 feet by 1.73 feet, or about 20.75 inches on each side.

No one likes running out of materials during a project, so calculating the right amount of gravel needed for your driveway is an absolute must. Multiply your driveway’s length by width by the depth of the gravel (in feet). For gravel depth, convert to a decimal (i.e., 4 inches is 0.33 feet). This will give you the cubic feet of material that you need. 

If you’re looking for cubic yards, divide that above number by 27.

Key considerations include dust control, soil erosion prevention, and protecting local wildlife habitats through sustainable clearing practices.

By submitting this question, I acknowledge and agree that Angi may publicly display my name, city, state, and question on the website for professionals and others to see.

The Edison, GA homeowners’ guide to mulch and topsoil services

From average costs to expert advice, get all the answers you need to get your job done.