Top-rated basement remodelers.

Get matched with top basement remodelers in Redlands, CO

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Redlands, CO?

Select your specific project to find the pro for you.

TRUSTED BY REDLANDS, CO HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon20
    Verified basement remodels reviews

Find Basement remodelers in Redlands

Avatar for Solveson Builders
Solveson Builders
4.2(
33
)
Basement - Remodel

Serving Redlands, CO and surrounding areas

Approved

In business since 2020

Free estimates

Emergency services offered

Solveson Builders is an experienced design-build and construction company serving Grand Junction, Colorado and surrounding areas. We specialize in custom home building, major home renovations, additions, kitchen and bathroom remodeling, deck building, window and door installation, and other residential construction projects. \n\nWith extensive experience from large-scale remodels to complete custom home builds, we focus on quality craftsmanship, attention to detail, and bringing each homeowner’s vision to life. Contact Solveson Builders today to discuss your project and request an estimate.

Custom douglas fir porch
Loma kitchen remodel
Custom spruce porch
Family room remodel
granite kitchen remodel

+10

Recommended by58%of homeowners
Avatar for AJG Contractors, LLC
AJG Contractors, LLC
4.7(
14
)
Basement - Remodel

Serving Redlands, CO and surrounding areas

Approved

In business since 2018

Free estimates

Warranties offered

With over 31 years experience in the construction industry, AJG Contractors is your industry expert. We pride ourselves on our extreme professionalism and attention to detail. Our customer satisfaction guarantee will assure you we will not leave your property until you are completely satisfied with our work. As a family owned/Veteran operated business you can trust that we will treat your home as we would treat our own.

New Construction
New Construction
New Construction
New Construction
New Construction

+5

2 neighbors recently requested a quote
Recommended by30%of homeowners
Avatar for Stonepeak Builders
Stonepeak Builders
5.0(
6
)
Basement - Remodel

Serving Redlands, CO and surrounding areas

Approved

Free estimates

Warranties offered

Offers commercial services

"Austin and his guys helped me re-do my kitchen and all the trim work in my home. They were amazing, I was a pretty small job in the big world but he/they didn’t act like I was any less important. I’ve since moved but I recommend Stonepeak Builders 100%!"
EFH - After
5 neighbors recently requested a quote
Showing 1-10 of 49
Basement Remodel questions, answered by experts

Basements with persistent moisture problems or flooding shouldn’t be finished until the moisture issues have been fixed. In addition, if your foundation is cracked, you have unmitigated radon levels, or you have asbestos or lead pipes, remediate the underlying problem before finishing your basement. Turning a basement into living space before fixing these issues can lead to serious health risks or structural damage. 

Common mistakes when finishing basement walls include neglecting proper insulation, insufficient moisture management, and poor ventilation. Not addressing these issues can lead to mold growth, water damage, and discomfort. Additionally, inadequate planning, improper framing, and rushing the project can result in subpar outcomes. 

It's essential to follow best practices, seek professional guidance if needed, and prioritize thoroughness and attention to detail.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Yes, you can add a kitchenette to a basement. However, you’ll have to consider the costs associated with basement kitchenettes. If you’re starting from scratch in an unfinished basement, you’ll need to account for brand-new plumbing, electrical, flooring, and more in addition to the cost of the kitchenette. If you’re putting a kitchenette in an already finished basement equipped with plumbing and electrical, you’ll save considerable money.

When choosing materials for finishing basement walls, consider factors such as moisture resistance, durability, and fire resistance. Opt for materials specifically designed for basement environments, like moisture-resistant drywall or cement board. Insulation with vapor barriers can help regulate temperature and prevent condensation. Consider using mold-resistant paints or coatings. 

Research and consult with experts to select materials that are suitable for your specific basement conditions and intended use. Prioritize quality and compatibility to achieve long-lasting and aesthetically pleasing results.

The Redlands, CO homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.