Top-rated basement remodelers.

Best basement remodelers near Clifton, CO

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Clifton, CO?

Select your specific project to find the pro for you.

TRUSTED BY CLIFTON, CO HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon20
    Verified basement remodels reviews

Top-Rated Basement remodelers in Clifton - Updated Nov 2026

Avatar for Stonepeak Builders
Stonepeak Builders
5.0(
6
)
Basement - Remodel

Serving Clifton, CO and surrounding areas

Approved

Free estimates

Warranties offered

Offers commercial services

"Austin and his guys helped me re-do my kitchen and all the trim work in my home. They were amazing, I was a pretty small job in the big world but he/they didn’t act like I was any less important. I’ve since moved but I recommend Stonepeak Builders 100%!"
EFH - After
7 neighbors recently requested a quote
Avatar for JD Remodeling & Decorating
JD Remodeling & Decorating
4.1(
14
)
Basement - Remodel

Serving Clifton, CO and surrounding areas

Free estimates

Credit card accepted

"Jd did an excellent job! Our shower was tiny we wanted to expand the job did not go as expected and jd was able to figure out a solution for us! The job turned out beautiful. Was always on time. Always responded to messages and phone calls. Gave a fair estimate. He will be doing any other home work we need in the future!"
DECK
Deck
New construction
DECK
Deck

+42

Recommended by83%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Clifton, CO and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
...
Showing 1-10 of 51
Basement Remodel FAQs, answered by experts

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Roughing in and connecting utilities are the hardest parts of finishing a basement, and they’re the parts we typically don’t recommend doing as a DIY project. Unfortunately, your finishing timeline can be extended by weeks while you wait for contractors and inspectors to install electrical wiring, plumbing lines, and heating/cooling equipment and carry out inspections.

Yes, adding a walkout basement will usually bump up your property value. Most homeowners prefer walk out basements because the exposed wall that’s level with the ground provides more utility via a ground-level exterior entrance, and they can fit full windows, which adds natural light and ventilation to the basement area. The only exception might be in areas prone to tornadoes, as walkout basements aren’t as safe as regular basements during a tornado, particularly if they include large windows or glass sliding doors.

Walkout basements are not generally included in a home’s square footage, although they may be if they meet certain conditions that depend on local regulations. A finished walkout basement used as a living space may be counted toward square footage in some locations as long as all codes for livable space are met.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Clifton, CO homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.