Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Dolores, CO

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Dolores, CO?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Dolores

Avatar for Spray Specialists LLC
Spray Specialists LLC
4.0(
1
)

Serving Dolores, CO and surrounding areas

In business since 2024

Free estimates

Offers commercial services

We pride our company on reliability, great communication, integrity, and quality work. We are experts in our trade and will do our best to keep you as educated as we can on your particular task or project. We look forward to earning your business!

Response time7 hrs
Reyes Concrete Services
New to Angi

Serving Dolores, CO and surrounding areas

In business since 2012

Free estimates

Warranties offered

We at Reyes Concrete Services live and breathe concrete. We love helping homeowners realize their dreams and vision for their property. We have also worked with companies of all sizes for the past 20 years. We are committed to our customers and excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

Stamped concrete
Stamped concrete
After driveway
Stamped concrete
Stamped concrete

+4

Concrete Mudjacking questions, answered by experts

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

Concrete leveling is absolutely worth it if you have sunken concrete slabs and want to restore them to level, especially if the slab is part of your home foundation. Concrete leveling is less than half the price of replacing concrete sidewalks, patios, walkways, and pool decks, and it’s about a quarter of the cost of replacing a foundation. If you also treat the underlying problem, it can be a worthwhile and permanent solution.

Pros often use mudjacking or polyurethane foam injection to level a sunken concrete patio. Both methods lift the slab by filling voids beneath it. After properly compacting the soil beneath it to prevent future settling, the concrete may need to be removed and re-poured for severe sinking.

Costs range from $500 to $1,500, depending on the size and condition of the area.

The Dolores, CO homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.