Top-rated generator install pros.

Get matched with top generator install pros in Descanso, CA

Enter your zip and get matched with up to 5 pros

Need a pro for your generator install project in Descanso, CA?

Select your specific project to find the pro for you.

Find Generator install pros in Descanso

Home Pro Remodeling & Construction, Inc.
4.1(
31
)
Portable Generator - Repair

Serving Descanso, CA and surrounding areas

Approved

In business since 2019

Free estimates

Credit card accepted

"This was an usual project. It was redoing a mini bar. Hard to find a contractor that would do it or had the time. Homepro was great lead by project manager Shir Hadad. Jumped right in there and took it on and got the job done. Really appreciate their professionalism."
Response time5 days
Recommended by77%of homeowners
Avatar for Eddie's electric
Eddie's electric
5.0(
1
)
Portable Generator - Repair

Serving Descanso, CA and surrounding areas

Approved

Small jobs welcome

Credit card accepted

"Excellent work. From the start he showed professionalism, punctuality, and great attention to detail. The installation was clean, well organized, and working perfectly both indoors and outdoors. He also explained everything clearly and made sure everything was safe and ready to use. I definitely recommend him for any electrical work — reliable service and top-quality results."
Avatar for Martin Electric
Martin Electric
New to Angi
Fixed Generator - Install

Serving Descanso, CA and surrounding areas

Approved

In business since 1999

Free estimates

Credit card accepted

Typically involves upgrading electric service with new or expanded electric panels & a larger main service cable. Often done as part of a remodeling project or when additional electrical appliances & fixtures are desired.

Response time5 hrs
Goal
New to Angi
Portable Generator - Repair

Serving Descanso, CA and surrounding areas

Approved

Free estimates

Emergency services offered

Small jobs welcome

Hi, I’m Bruno!\n\nI’m a reliable and detail-oriented handyman with hands-on experience in home repairs, installations, and improvements. I’ve worked on a wide range of projects including drywall repair, painting, door and lock fixes, plumbing installations, electrical fixtures (like fans and lighting), and general home maintenance.\n\nI take pride in doing clean, quality work and making sure the job is done right the first time. I’m also easy to communicate with, always on time, and respectful of your home and space.\n\nWhether it’s a small fix or a project you’ve been putting off, I’m here to help make it simple and stress-free.

...
Showing 1-10 of 65
Generator Install questions, answered by experts

As a safety measure, you should always turn off the main breaker while operating your generator’s backup breaker. In addition, you should also switch off all appliance breakers so you don't have a power surge when the main breaker turns back on. And finally, turning off the main breaker prevents back-feeding, which endangers utility workers with the risk of electrocution. Back-feeding could also destroy the electrical circuits of your neighbors if they use the same power network.

In most cases, there are no tax credits available for home generators. However, that’s a general statement that applies to federal tax credits, so you might have access to state or local tax incentives. You can check the Database of State Incentives for Renewables & Efficiency (DSIRE) for more information about your area. If you hire a reliable home generator installer, they should also know if there are any state or local perks you can use to reduce your installation costs, including tax breaks and rebates.

Here’s what you can run with different wattages and types of generators:

Portable generator:

  • 2,000 watts can handle a large appliance like a freezer or refrigerator, plus a few smaller items like phones or computer chargers. 

  • 4,000 watts will keep two large appliances operating and a few smaller devices.

  • 8,000 watts should power most essential appliances and other devices, including a sump pump, well pump, or your dishwasher.

Partial to whole-house generator:

  • 20,000 watts and above will make it seem like your home’s power is still on.

Setting up utilities on a vacant property usually takes at least a few months, or between 6 weeks to 16 weeks. This process requires working with the local planning and zoning department, hiring a building contractor or engineer to design the utility layout, securing permits, laying the lines, and connecting the utilities.

To power a central air system during a power outage, the whole-house generator will need to be at least 5,000 watts, and this number will significantly increase for larger units. Check the specific wattage requirements of your AC unit to choose the right generator size. Consider consulting a generator installer to ensure your whole-house generator meets your electrical load needs.

The Descanso, CA homeowners’ guide to generator installs

From average costs to expert advice, get all the answers you need to get your job done.