Top-rated rototilling pros.

Get matched with top rototilling pros in Gould, AR

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Gould, AR?

Select your specific project to find the pro for you.

Find Rototilling pros in Gould


Rototilling questions, answered by experts

Water pooling, uneven surfaces, or basement leaks are indicators.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

Many ways to landscape a steep slope on a budget exist. Avoiding expensive retaining wall construction is the first step. Consider creating a rocky slope with boulders or large stones, or think about planting perennials that return every year with a single investment. Transplanting small trees from elsewhere on your property is also possible and can help to stabilize steep slopes without purchasing new ones. 

Typically 1-3 days, depending on property size and terrain condition.

A perc test takes an average of around two hours, but it can range from one hour up to around six hours. Perc tests that require wider or deeper holes and those that require multiple holes dug throughout your property will take longer because there’s more excavation involved. The actual filling of the hole and monitoring to gauge the rate of percolation should take under an hour per hole.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.