Top-rated solar panel pros.

Get matched with top solar panel pros in Grady, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your solar panel service project in Grady, AL?

Select your specific project to find the pro for you.

Find Solar panel pros in Grady

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)
Solar Water Heater System - InstallSolar Water Heater System - Install - For BusinessSolar Water Heater System - Repair+1 more

Serving Grady, AL and surrounding areas

In business since 1971

Credit card accepted

"The last was a rental company that we have and we used them for an air conditioning and heating system. It was Bototach Mechanical. It’s been a good program for us. They’re very responsive. I don’t know what the thought process was. My husband said, well let’s try these guys and so we did. We have an older home and it’s proved to be a very good deal. The quality has been pretty good, so I would give them an A for the quality. I will give you one helpful hint though. If the company decides they want to replace an appliance, you need to call them and negotiate with them because you can upgrade, but you need to talk to them in person not just do it over the internet."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
DS Quality Home Improvement
5.0(
2
)
Solar Water Heater System - InstallSolar Water Heater System - Install - For BusinessSolar Water Heater System - Repair+1 more

Serving Grady, AL and surrounding areas

In business since 2011

Since breaking into the industry in 2011, DS Quality LLC has been recognized as a dependable contractor. We’ve provided clients with a wide range of services for all their needs. Whatever you have in mind, our professionals work to bring your dreams to life. Contact us to receive a free estimate today.

Fencing Project
Fencing Project
Fencing Project
Recommended by100%of homeowners
Solar Panels questions, answered by experts

Solar panels should get at least four to six hours of direct sunlight daily. It’s even better if sunlight reaches panels between the peak hours of 10 a.m. and 3 p.m. This is enough to power a home, depending on your solar system’s size and energy needs. Remember that panels will generate some power under cloudy skies or in the shade, and many systems compensate for lower sun exposure by drawing energy from the grid or battery storage.

  • Installing a new electrical meter box

  • Replacing your meter base

  • Replacing your service entrance cable 

The cost to install or upgrade an electrical meter box ranges from $100 to $650, including $50 to $250 for the unit. The meter base passes the power from your electric company to your panel. The cost to replace a meter base is roughly $50 to $250. 

Service entrance cables are electrical cables with multiple wires, bringing power from electrical companies to residential buildings. The cost to replace a service entrance cable ranges roughly from $1,000 to $1,500.

Solar panels can protect your roof from hail, as they can withstand hail up to 1 inch in diameter that falls up to 50 mph. Your solar panels may experience damage if the hailstones are bigger and travel faster. Your roof can still suffer hail damage, and it’s essential to look for signs and repair issues right away. Roof damage can lead to leaks and water damage inside your home.

There are a few great questions to ask a solar contractor or inspector when you speak to them. You’ll probably want to find out about the energy yield and efficiency of your array, ensuring the actual output matches the amount you calculated when installing the array in the first place. It’s also a good idea to find out about any damage or wear and tear on the array and to inquire about how soon you need to make repairs or replacements to essential components.

The time it takes to install solar panels depends on the number of panels and the size of your home, but installation takes between two and three days of work. While most contractors can install the panels over the course of a couple of days, switching to solar energy can take two to three months in total. This includes the time it takes to design the system, procure the parts, obtain the permits, install the panels, connect to the main power grid, and get an inspection.

The Grady, AL homeowners’ guide to solar panel services

From average costs to expert advice, get all the answers you need to get your job done.