Top-rated asphalt driveway pros.

Best asphalt driveway pros near Camp Hill, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Camp Hill, AL?

Select your specific project to find the pro for you.

Top-Rated Asphalt driveway pros in Camp Hill - Updated Nov 2026

Avatar for Hawkins Landscaping
Hawkins Landscaping
3.8(
3
)
Gravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Camp Hill, AL and surrounding areas

Approved

In business since 2019

Free estimates

Offers commercial services

Hawkins Landscaping is committed to excellence every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and responsibility in all of our jobs. We are a locally owned and operated business with more than 2 years of experience serving Jackson Gap, AL and surrounding areas. There is no job too big, or too small for our team. Call today and let us put our experience to work for you!

Response time1 day
1 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Moses Concrete Contracting LLC
Moses Concrete Contracting LLC
New to Angi
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Camp Hill, AL and surrounding areas

Approved

In business since 2018

Free estimates

Credit card accepted

Established in 2018, Moses Concrete Contracting is committed to excellence and continues to be an outstanding business in Columbus, GA area. We pride our self on an outstanding record of quality service. Our longevity is a testament to the level of service and quality you will get when you choose Moses Concrete Contracting for your commercial concrete and lawn care needs. We are excited that you have expressed an interest in our services and we look forward to working with you, give us a call today! \n

6 neighbors recently requested a quote
Sgt. Stripes Asphalt Maintenance, LLC
5.0(
7
)
Asphalt Paving - Repair or PatchAsphalt Sealing

Serving Camp Hill, AL and surrounding areas

In business since 2025

Free estimates

Credit card accepted

"Sgt. Stripes Asphalt did a fantastic job. I am in Kentucky and the job was in Georgia. They were very efficient, communicated with me. They did the job on the weekend so there would not be any traffic in and out of Post-Office parking lot. Their customer service and work great. I would definitely recommend them."
Response time2 days
...
Showing 1-10 of 94
Asphalt Driveways FAQs, answered by experts

A driveway approach is the part of a driveway where the public road meets the private driveway. This section contains several key elements, including the driveway apron, the curb cut, and the end slope. Depending on the slope of the driveway, this area may also contain the trench drain.

Your city or county will have guidelines about the minimum and maximum width and length of private roads. The average private road is 12 feet wide, and length, of course, depends on your property. Requirements also depend on the amount of traffic and types of vehicles your road experiences. Check with local ordinances before planning a road on your property.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

Asphalt is made of aggregate materials (sand, rocks, and gravel) and bitumen, a viscous, petroleum-based, waterproof substance. These materials are mixed together at extremely high temperatures to form asphalt.

Driveways should be sloped with a minimum 2% slope—anything lower will cause precipitation and runoff to collect. A 2% slope is the equivalent of a 2-foot rise over 100 feet. One quick way to check the integrity of your driveway’s slope: no more than four inches of water should collect on the surface longer than 15 minutes after rain.

The Camp Hill, AL homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.