Top-rated ceramic tile pros.

Get matched with top ceramic tile pros in Clendenin, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your ceramic tile service project in Clendenin, WV?

Select your specific project to find the pro for you.

Find Ceramic tile pros in Clendenin

Avatar for Phares Property Management
Phares Property Management
4.8(
12
)
Tile: Ceramic and Porcelain - Repair

Serving Clendenin, WV and surrounding areas

Approved

In business since 2024

Free estimates

Emergency services offered

"David showed up on time, provided a well priced estimate, began the work when scheduled and stayed in touch with updates throughout the project. Would recommend and rehire"
Gutter installation
Gutter installation
Gutter installation
Roof Replacement
Roof Replacement

+1

Response time8 hrs
Response rate98%
13 neighbors recently requested a quote
Avatar for A1 Renovation
A1 Renovation
5.0(
5
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Ceramic and Porcelain - Repair+1 more

Serving Clendenin, WV and surrounding areas

In business since 2023

"Three days after presenting me a quote they started work. In my experience that’s unheard of. A 1 Renovation replaced the screen on a screened in porch and they did an excellent job. They arrived at 8:30am and finished by 2:30pm even though winds were fierce and it was cold. If I could I’d give them 6 stars. They’re that good!"
Remodeling - General Project
Remodeling - General Project
Remodeling - General Project
Remodeling - General Project
Roofing Project

+82

Recommended by100%of homeowners
Showing 1-10 of 38
Ceramic Tile questions, answered by experts

Many homeowners have successfully retiled a bathroom themselves. It can be a challenging but rewarding process, but it’s best for someone who already has at least intermediate DIY skills.

Yes, but you’ll have to use some other type of tool to avoid damaging the tile and possibly injuring yourself. Some alternatives to tile cutters include a glass cutter, angle grinder, and wet saw. Depending on the tile material, you might simply be able to measure and score it with something sharp, like a carbide-tipped pencil, and break it off. Be sure to sand the edge for a smooth installation.

On average, tiling a bathroom involves about 12 hours of labor, usually spread over two to three days to accommodate prep work and curing times. A professional tiler can often complete the installation in 6 to 8 hours, whereas a DIYer might take 10 to 16 hours. The total project time is influenced by factors like the bathroom layout, tile type, and necessary prep work, such as removing old tile. The process includes specific timelines for different areas; for example, tiling a floor takes about six hours, while a shower area can take six to ten hours. It is essential to allow for adequate curing time—typically 24 hours each—for the mortar, grout, and caulk, which is why the project extends over several days.

Yes, you can tile over existing shower tiles, but it's better to remove the old tiles first for the best results. Tiling over existing tiles requires a clean, level surface and proper adhesion. If the old tiles are in good condition, you can roughen the surface to improve adhesion. However, removing the old tiles ensures a smoother, longer-lasting finish and prevents potential issues down the line.

No, you don’t need to remove the old grout before installing new tile over existing tile. In fact, the old grout helps fill in gaps between tiles, creating a more even surface for the new layer. However, it's important to ensure that the grout is clean, solid, and free of cracks or crumbling areas. Damaged grout should be repaired or replaced before proceeding. Cleaning the surface thoroughly and filling any low spots will help the new adhesive bond properly and ensure a smooth, stable installation.

The Clendenin, WV homeowners’ guide to ceramic tile services

From average costs to expert advice, get all the answers you need to get your job done.