Top-rated rototilling pros.

Get matched with top rototilling pros in Minong, WI

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Minong, WI?

Select your specific project to find the pro for you.

Find Rototilling pros in Minong


Dillons Small Engine Repair

No reviews yet

Dillons Small Engine Repair

No reviews yet
14 years of experience

Dillon's Small Engine is a growing locally owned and operated small engine repair shop that offers reasonable repair rates and quality work with quality parts. We work on almost anything from chainsaws to motorcycles.

Dillon's Small Engine is a growing locally owned and operated small engine repair shop that offers reasonable repair rates and quality work with quality parts. We work on almost anything from chainsaws to motorcycles.


Impact Land Care

1.00(
3
)

Impact Land Care

1.00(
3
)
20 years of experience

Large commercial and residetial landscape and grounds maintenance company servicing Chicago to Milwaukee. Large employee workforce and equipment inventory to handle any job required both large or difficult.

Large commercial and residetial landscape and grounds maintenance company servicing Chicago to Milwaukee. Large employee workforce and equipment inventory to handle any job required both large or difficult.

Rototilling questions, answered by experts

While some areas may allow for a slope of up to 20%, this is often the maximum slope for driveways, with a few exceptions of up to 25%. Other regions may have a maximum of 12%, 15%, or 18%, so check with your local building department to ensure you’re laying a driveway that is up to code for your location.

Typically 1-3 days, depending on property size and terrain condition.

A perc test takes an average of around two hours, but it can range from one hour up to around six hours. Perc tests that require wider or deeper holes and those that require multiple holes dug throughout your property will take longer because there’s more excavation involved. The actual filling of the hole and monitoring to gauge the rate of percolation should take under an hour per hole.

Pros will assess your soil type, property geography, and rain patterns for optimal slope.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.