Top-rated asphalt driveway pros.

Best asphalt driveway pros near Fox Lake, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Fox Lake, WI?

Select your specific project to find the pro for you.

Top-Rated Asphalt driveway pros in Fox Lake - Updated Nov 2026

Avatar for A+ Tree & Arborists LLC
A+ Tree & Arborists LLC
5.0(
1
)
Interlocking Pavers for Driveways & Floors - Install

Serving Fox Lake, WI and surrounding areas

Approved

In business since 2001

"We have used A+ Lawn Care for a number of years. Was thrilled when they added the tree and arborist services. They showed up today to 'clean up' the sucker growth on 2 very large Honey Locust, a crab apple and a cluster of mulberry trees. As always the crew that showed up, were prepared to work, did their work, cleaned up after themselves. In this case, I reminded them we had concrete decorative curbing around 3 of the 4 trees. Installed by A+ Lawn Care but buried in the snow. They carefully cleaned the snow off the curbing so they knew where it was. No damage done. We weren't so lucky with another tree company - and there was no snow then. Our experience with A+ Lawn Care and now A+ Tree & Arborist were great. I have recommended A+ Lawn Care a number of times and will do the same for A+ Tree & Arborist"
CM Customs LLC
New to Angi
Interlocking Pavers for Driveways & Floors - Install

Serving Fox Lake, WI and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

I have 20 years of experience in the masonry and concrete industry. I also have 10+ years with carpentry and general trades. 10 years of project management experience managing projects from a few hundred dollars to multimillion dollar. Thank you for taking the time to read and looking forward to working with you..

...
Showing 1-10 of 57
Asphalt Driveways FAQs, answered by experts

This creates a risk for your driveway to fail after asphalt curing because it doesn't have a lasting bond with the surface. In order to get asphalt to perform as intended, it's necessary to prepare the dirt surface correctly first. The loose soil base under the new driveway must be compacted until it is stable enough to support the weight of the asphalt.

Asphalt, which is stone mixed with tar, is the most common material for outdoor basketball courts because it’s so sturdy and versatile. However, you don't have to use it: another option is polymeric rubber, which has shock pads that can prevent injury. This option is a little more expensive, ranging between $16 and $25 per square foot.

Materials used for indoor basketball courts, such as hardwoods, aren’t really an option outdoors.

While paving a driveway is possible to do as a DIY project, we don’t recommend it. Hiring a driveway professional to pave it will ensure that your driveway looks neat and clean and lasts for years to come, and it will also prevent a weak driveway and, potentially, damage to your foundation. Paving a driveway requires heavy machinery, and while you can rent the equipment needed, operating it close to your garage slab or around your home’s foundation can crack it and lead to structural issues. 

The dimensions of a driveway apron vary based on local building codes, the width of your driveway, and the distance between the driveway and the road. On average, aprons range from 12 to 24 feet wide and 8 to 18 feet long. Typically, the end of the apron connected to the driveway matches its width—such as 10 to 12 feet for a single-car driveway—while the end at the street flares out to allow cars to turn in and out more easily. In some areas, you may not be responsible for the portion of the apron that extends beyond the sidewalk, but this depends on local laws.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

The Fox Lake, WI homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.