Top-rated land surveyors.

Get matched with top land surveyors in Wilder, VT

Enter your ZIP and get matched with up to 3 pros

Need a pro for your land surveying project in Wilder, VT?

Select your specific project to find the pro for you.

Find Land surveyors in Wilder

No results for Land Surveying in

Try adjusting your search criteria.
Land Surveying questions, answered by experts

Building a road on a slope requires careful planning and will normally require a drainage system underneath to prevent flooding and damage to the road over time. Your professional may lengthen your road to create switchbacks if the slope directly to your home is too steep, as there are regulations for maximum road slope. The drainage system will help prevent runoff from the higher side of the slope from damaging the asphalt or concrete. Keep in mind that building a road on a slope isn’t a good DIY project, as a lot can go wrong.

A land survey gives you information about the property boundaries, easements on the plot, dimensions, and, in some cases, topographical information. A land appraisal will often take these figures into account, but the purpose of a land appraisal is to determine the value of the land rather than the physical specifications.

You can’t build on undeveloped land without preparing it for construction, which involves running utilities to the site or accounting for private utilities like wells and septic systems and grading and compacting the soil for safe construction. Once you prepare the land, you can build on it as long as the project abides by local zoning regulations.

Costs vary, but you can expect to spend between $1,000 and $4,000 to prepare land for a mobile home or before you build a house. You’ll need to clear enough land for the foundation, which may require leveling or grading, as well as removing trees, stumps, and plants. Don’t forget to plan for permits and fees and the installation of a gas line, water line, and sewer main.

Professionals who complete perc tests can usually do them in a single day. Including excavating to expose the test site, filling the hole with water, and monitoring it while it drains, you can expect the test to take between four and eight hours total. It’s possible that you’ll get the results the same day, but some companies may take a few days to get official results.

The Wilder, VT homeowners’ guide to land surveying services

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"