Top-rated home builders.

Get matched with top home builders in Strafford, VT

Enter your zip and get matched with up to 5 pros

Need a pro for your home building project in Strafford, VT?

Select your specific project to find the pro for you.
Home Building questions, answered by experts

Green homes are often more expensive to build, averaging around $200 per square foot compared to the $150 per square foot you’d spend to build a standard home. However, green homes can save you money on your utility bills by consuming less energy or creating energy using solar panels or wind turbines on-site. They’re more expensive to build, but they often end up costing less in the long run.

Historically, Tudor homes originally stemmed from the 15th and 16th centuries, while Victorians appeared during Queen Victoria's reign in the 19th century. The design and structural differences are significant as well. The many types of Victorian architecture—such as Italianate architecture—typically feature ornate trim, wood siding, wraparound porches, and tall towers on top, such as belvederes. On the other hand, Tudor-style homes feature white stucco exteriors with exposed wooden rafters marking the house frame both inside and out.

Modular homes can go up or down in value depending on a few factors. In areas where real estate is appreciating, the value of modular homes is likely to increase, and vice versa. Additionally, the value of modular homes depends partially on the area. In cities where every other home is stick-built, modular homes might be considered a functional obsolescence, in which case they could be less desirable and go down in value. In either case, though, modular homes can still be a good investment, especially since they provide housing at a lower upfront cost.

The longest part of building a custom home is the design phase. It takes multiple professionals and a ton of work to bring your vision for your dream home to life while sticking to a homebuilding budget and also ensuring everything is built to code. Expect the design phase for a custom home build to take six months to a year.

A custom home is one that you design from the ground up, allowing you to customize everything from the square footage to the interior layout to all of the materials used. A spec home is one that a builder has designed and gotten approvals for. Spec homes may give you some limited options for the layout and materials, but most of the build is pre-set. Custom homes cost more and take longer to build.

The Strafford, VT homeowners’ guide to home building services

From average costs to expert advice, get all the answers you need to get your job done.