Get matched with top concrete mudjacking pros in Henry, VA
Top-rated concrete mudjacking pros.

Need a pro for your concrete mudjacking project in Henry, VA?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Henry

Avatar for JES Foundation Repair
JES Foundation Repair
4.1(
607
)

Serving Henry, VA and surrounding areas

Approved (Corporate)

Super Service Award Winner

In business since 1993

Free estimates

Warranties offered

"I was disappointed that the concrete slab didnâ t raise all the way. I was warned by the salesman that this could happen. The people who did the work said to wait a few months and they will try again under warranty."
Protect Your Basement
Correct Your Wet Basement
Waterproof Your Basement
Protect Your Concrete
Polyurethane Foam Injection

+12

106 neighbors recently requested a quote
Recommended by75%of homeowners
Avatar for Pro Mover
Pro Mover
3.7(
3
)

Serving Henry, VA and surrounding areas

In business since 2015

Emergency services offered

Credit card accepted

"Looking for Quality Service; look no further. Pro Movers is the Provider you need to organize your move. Daniel and his crew really made my move smooth as silk. They took excellent care of all my belongings and worked expeditiously. They worked tirelessly the entire contracted time and made sure I was satisfied every step of the way. Great value for all the hard work they do. I was extremely satisfied!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+11

Recommended by100%of homeowners
Concrete Mudjacking questions, answered by experts

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

Trenching and boring are two distinct methods for installing underground utilities. Trenching involves digging a channel using equipment like an excavator, trencher, backhoe, or shovel. While it is a simpler process, it causes significant disruption to the surface, landscaping, and surrounding ecosystems.

Boring, also known as directional boring, is a less invasive alternative that uses a drill to create a tunnel for utility lines without disturbing the surface. This method is more precise and is ideal for installations that need to go underneath buildings, roads, or bodies of water. Although boring is less disruptive, it is generally more expensive than trenching.

The timeframe is generally a few hours, allowing for immediate use post-hydration, ensuring minimal disruption to surrounding activities.

Charges correlate with surface size, settlement depth, and access, often yielding significant savings over concrete replacement.

Polyjacking can be a permanent solution to sunken concrete if you also address the underlying issue—like poor drainage—at the same time. The polyurethane material itself can last as long as or even outlast the concrete you’re lifting it with. Your sunken concrete issue will likely return if you don’t couple polyjacking with proper drainage to prevent future soil movement and sinking.

The Henry, VA homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.