Top-rated sandblasting pros.

Get matched with top sandblasting pros in Ivins, UT

Enter your zip and get matched with up to 5 pros

Need a pro for your sandblasting service project in Ivins, UT?

Select your specific project to find the pro for you.

TRUSTED BY IVINS, UT HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon73
    Verified sandblasting services reviews

Find Sandblasting pros in Ivins

Avatar for Ritchie, LLC
Ritchie, LLC
New to Angi

Serving Ivins, UT and surrounding areas

In business since 2016

Free estimates

We're a locally owned and operated company with 15 plus years of industry experience. We value honesty and integrity, and stand behind our work. We specialize in both interior and exterior residential and commercial painting projects. We pride ourselves on the quality of our work as well as our commitment to outstanding results. We look forward to building long-term relationships with our clients and guarantee your satisfaction!

Concrete Floor Coatings
Kanab Fire House
Concrete Floor Coatings
Jump Man Court
Concrete Floor Coatings

+4

Response time2 days
Sandblasting Services questions, answered by experts

If you’re DIYing the project, it could take up to a week if you aren’t able to dedicate full-time hours. If you hire a professional and they arrive with a team, expect your stairs to be sanded in as little as 2 hours (for simple projects). Finishing the stairs takes a while longer as there are drying and sealing times to consider, but the actual work will take much less time than the sanding portion.

The cost of sandblasting depends on the scope of the project, the surface type, labor, and equipment required. Services typically cost between $50 and $80 per hour, though most professionals charge by surface area at a rate of $1.50 to $7 per square foot. Total project costs can range from $700 to $12,500, with an average homeowner spending around $3,200 to sandblast a 1,000-square-foot surface.

Costs depend on paint type, surface condition, labor, and required prep work for repainting.

Most projects take 1-3 days, depending on the surface area and complexity.

Sand is a common sublayer for hardscape features like driveways, paver patios, and more. Most projects that involve sand require a 1-inch layer to promote evenness, drainage, and weight distribution. For further drainage, most projects have a 6-inch minimum layer of gravel beneath the sand. 

The Ivins, UT homeowners’ guide to sandblasting services

From average costs to expert advice, get all the answers you need to get your job done.