Top-rated basement remodelers.

Get matched with top basement remodelers in Mount Enterprise, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Mount Enterprise, TX?

Select your specific project to find the pro for you.

Find Basement remodelers in Mount Enterprise

Avatar for TBU CONSTRUCTION LLC
TBU CONSTRUCTION LLC
5.0(
3
)
Basement - Remodel

Serving Mount Enterprise, TX and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"These guys did a fantastic job. They arrived on time, communicated with me as to what they were doing and finished when they said they would. The ceiling in my home has a rough transition to the wall, but they were able to make the paint line perfectly crisp and straight. My wife was very happy about that I would definitely recommend."
Painting - Exterior Project
Remodeling - General Project
Painting - Exterior Project
Remodeling - General Project
Painting - Exterior Project

+11

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Mount Enterprise, TX and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Bankard Services
Bankard Services
5.0(
6
)
Basement - Remodel

Serving Mount Enterprise, TX and surrounding areas

Free estimates

Emergency services offered

Small jobs welcome

Maintenance professional with 20+ years of experience in mechanical systems, troubleshooting, and repair. I specialize in home repairs, fixture installs, drywall patching, and custom solutions—including welding and light fabrication. I take pride in clean, reliable work and showing up on time.\n\nI’m especially good at solving problems other contractors can’t or won’t take on. Whether it’s a small repair or a list of projects, I focus on getting it done right the first time. No sewer or major plumbing work.

Metal Fabrication
Metal Fabrication
Metal Fabrication
Metal Fabrication
Metal Fabrication

+10

Showing 1-10 of 36
Basement Remodel questions, answered by experts

Yes, adding a walkout basement will usually bump up your property value. Most homeowners prefer walk out basements because the exposed wall that’s level with the ground provides more utility via a ground-level exterior entrance, and they can fit full windows, which adds natural light and ventilation to the basement area. The only exception might be in areas prone to tornadoes, as walkout basements aren’t as safe as regular basements during a tornado, particularly if they include large windows or glass sliding doors.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Walkout basements are not generally included in a home’s square footage, although they may be if they meet certain conditions that depend on local regulations. A finished walkout basement used as a living space may be counted toward square footage in some locations as long as all codes for livable space are met.

Building up by adding square footage to the top of your home is often less expensive than adding a basement, but it depends on the specifics of your house, your property, and supply costs. Because building a basement requires excavation, it can be a more expensive option than building up.

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

The Mount Enterprise, TX homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.