Top-rated rototilling pros.

Get matched with top rototilling pros in Hinsdale, NH

Enter your zip and get matched with up to 5 pros

Need a pro for your rototilling project in Hinsdale, NH?

Select your specific project to find the pro for you.

Find Rototilling pros in Hinsdale


Ganio Land Management

No reviews yet

Ganio Land Management

No reviews yet
36 years of experience

We are a full service landscape company who has serviced southern New Hampshire and Vermont for the last 35 years. We have been voted Best of Monadnock for the last 9 years. If you would like to know more about our services got to our web page at www.ganioland.com Employees:9 Owner: David Ganio

We are a full service landscape company who has serviced southern New Hampshire and Vermont for the last 35 years. We have been voted Best of Monadnock for the last 9 years. If you would like to know more about our services got to our web page at www.ganioland.com Employees:9 Owner: David Ganio


Rototilling questions, answered by experts

Hardscaping often requires preparation of the ground in the area where the feature is being installed. This can include digging, compacting, and leveling the soil, ensuring adequate drainage, and removing any existing plants. The extent of preparation needed will depend on the type and size of the hardscaping feature being installed.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

A perc test takes an average of around two hours, but it can range from one hour up to around six hours. Perc tests that require wider or deeper holes and those that require multiple holes dug throughout your property will take longer because there’s more excavation involved. The actual filling of the hole and monitoring to gauge the rate of percolation should take under an hour per hole.

Pea gravel is hands down a top pick for managing landscape drainage.  These small stones allow water to flow through easily by creating natural gaps that promote runoff. Beyond functionality, pea gravel also offers visual versatility. Homeowners will find a range of earthy tones like gray, brown, blue, and even red, making it easy to match with different outdoor styles and plantings.

Typically 1-3 days, depending on property size and terrain condition.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.