Blumhagen Construction is a locally owned and operated company that values honesty and integrity in all aspects of our business. Our dedicated team of professionals have over 12 years of hands on experience, to provide innovative ideas and suggestions tailored to your projects. Our services are customized to your individual needs, paying close attention to the details of each project that we are involved with. Please feel free to contact us today!
Dock Building and Repair FAQs, answered by experts
Cedar wood is the best choice for a hardwood dock, as it is rot-resistant and does well in the water. Pressure-treated pine and spruce are two other solid options. Alternately, composite or waterproof plastic are materials commonly used for docks, and are frequently used in prefabricated kits.
To maintain a dock, perform regular inspections for structural issues, clean away debris, and apply a sealant to wood components. This protects the dock from water damage and prevents premature wear and structural damage.
Building a dock is a complicated and time-intensive project, so professional builders typically take several weeks or several months to complete dock construction. Smaller docks in relatively shallow water may take two to four weeks to complete, while large or ornate docks in deep water could take up to six months. The timeline depends on the size and type of dock you want, the weather conditions in your area, and how ornate the construction needs to be. Your dock builder should give you an estimated timeline for construction along with your quote.
Most dock builds take 1-4 weeks, depending on design, permitting, and weather conditions.
Yes, many professionals handle necessary permits to ensure legal compliance.
The Rolla, ND homeowners’ guide to dock building and repairs
From average costs to expert advice, get all the answers you need to get your job done.