Top-rated concrete leveling pros.

Get matched with top concrete leveling pros in Richardton, ND

There are 1 highly-rated local concrete leveling pros.

Need a pro for your concrete leveling project in Richardton, ND?

Select your specific project to find the pro for you.

Find Concrete leveling pros in Richardton


American Waterworks

No reviews yet

American Waterworks

No reviews yet

American Waterworks are experts in basement waterproofing, foundation repair, radon mitigation, and concrete repair. Our aim is to redefine the industry by repairing the fractured relationship between homeowners and contractors. We provide permanent solutions to customers problems.

American Waterworks are experts in basement waterproofing, foundation repair, radon mitigation, and concrete repair. Our aim is to redefine the industry by repairing the fractured relationship between homeowners and contractors. We provide permanent solutions to customers problems.





Concrete Services LLC

4600 Carbine Dr
No reviews yet

Concrete Services LLC

4600 Carbine Dr
No reviews yet
15 years of experience

For almost a decade, Concrete Services LLC has been providing professional and reliable services to the Bismarck, Burleigh County, and surrounding areas. Allow our team to provide you with all of your concrete needs. Some of our specialties include: Concrete Installation and Repairs, Concrete Cutting, Curb Building, Grading, Driveway Paving, Sidewalks, Sub-Divisions, Parking Lot Construction, Striping, Excavation Services, Retaining Walls, Coating and Sealing to name a few.

For almost a decade, Concrete Services LLC has been providing professional and reliable services to the Bismarck, Burleigh County, and surrounding areas. Allow our team to provide you with all of your concrete needs. Some of our specialties include: Concrete Installation and Repairs, Concrete Cutting, Curb Building, Grading, Driveway Paving, Sidewalks, Sub-Divisions, Parking Lot Construction, Striping, Excavation Services, Retaining Walls, Coating and Sealing to name a few.




Flores Concrete Construction Inc

Serving Within 200 Miles Of
No reviews yet

Flores Concrete Construction Inc

Serving Within 200 Miles Of
No reviews yet
25 years of experience

Whether you need a patio, retaining wall, driveway or something in between, we are here to help. All you need to do is give us a call and we’ll take care of the rest. In the meantime, feel free to take a look around our site to learn more about our services. Please change to, If you have any questions or concerns, please contact us at any time. We look forward to hearing from you soon.

Whether you need a patio, retaining wall, driveway or something in between, we are here to help. All you need to do is give us a call and we’ll take care of the rest. In the meantime, feel free to take a look around our site to learn more about our services. Please change to, If you have any questions or concerns, please contact us at any time. We look forward to hearing from you soon.


Showing 1-10 of 15
Concrete Leveling questions, answered by experts

Yes, you can drive on concrete after seven days. While doing so, take extra care around the edges of the freshly poured concrete surface, as these areas may not be as strong as the main concrete surface. You should also avoid driving heavy trucks and machinery on new concrete until it’s fully cured, 28 days after it’s poured.

Yes, lampposts need a concrete base. The concrete base provides a stable foundation for the lamppost, which can be heavy from the weight of the light fixture and other accessories. A concrete base also provides structural support for the lamppost, keeping it from sinking into the ground or tipping over in the wind. 

Pool concrete or gunite can take several weeks to cure, or an average of 30 days, before workers can resume construction. Additional work and finishes push the time to build a pool out of concrete to between three and six months. There are many types of pools that take far less time, so keep these in mind if you're on a short timeline.

Drying concrete faster after rain is tricky because you’d need to increase the temperature or airflow over your slab, both of which are challenging to do outdoors. It can help to remove water from your concrete quickly, though, as the faster you remove rain from the surface, the lower the risk of the water affecting the ratio of your concrete mix. Use squeegees or mops to remove water, and consider covering your slab with a tarp to protect it from future rainfall.

While stamped concrete can last up to 50 years on average, a driveway will likely need repairs or resurfacing within 25 years. Comparatively, the life span of a stamped concrete driveway is much longer than those built with pavers or asphalt, which will often crack or break down under the weight of your vehicle much sooner.

By submitting this question, I acknowledge and agree that Angi may publicly display my name, city, state, and question on the website for professionals and others to see.

The Richardton, ND homeowners’ guide to concrete leveling services

From average costs to expert advice, get all the answers you need to get your job done.