Top-rated subcontractors.

Get matched with top subcontractors in Great Falls, MT

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Great Falls, MT?

Select your specific project to find the pro for you.

TRUSTED BY GREAT FALLS, MT HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon390
    Verified subcontracting services reviews

Find Subcontractors in Great Falls

Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Great Falls, MT and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Western Trim and Finish, LLC
Western Trim and Finish, LLC
4.2(
13
)
Major Home Repairs (General Contractor)

Serving Great Falls, MT and surrounding areas

In business since 2018

Free estimates

Credit card accepted

"From the first phone call until the inspection and goodbyes, working with Western Trim and Finish LLC was easy and enjoyable. Levi was always friendly and was always respectful to my wishes. His team arrived early, worked late and finished the deck within the 3-day time schedule he promised. He and his team added several extra finishing touches that make such a difference in my finished deck. It is hands down the best-built and most beautiful deck on my street! I hope to hire Western Trim and Finish LLC for my fence replacement. My advice is hire this company for your next outdoor project - you'll be dang happy you did!"
Response time3 days
Recommended by83%of homeowners
Avatar for Light Roofing Limited
Light Roofing Limited
5.0(
4
)
Major Home Repairs (General Contractor)

Serving Great Falls, MT and surrounding areas

In business since 2020

Free estimates

Credit card accepted

"They were great. They were able to get in very quickly to do the work, they were fast, the work was done in a timely manner and after the work was done the manager came back to do quality check if everything was good."
Recommended by100%of homeowners
Avatar for TCH Builders & Remodeling
TCH Builders & Remodeling
4.0(
2
)
Major Home Repairs (General Contractor)

Serving Great Falls, MT and surrounding areas

In business since 1999

Emergency services offered

Credit card accepted

If you dream it, we can build it. What's the biggest difference between us and them? We build to last! We offer a full line of Green and Energy Star Certified products, backed by our labor and manufacturer's lifetime transferable warranties. Credit Cards Welcome Financing Available OAC.

Recommended by100%of homeowners
Showing 1-10 of 26
Subcontractors questions, answered by experts

It can take anywhere from a few days to several months to draw up architectural plans, depending on the complexity of your project. Architectural plans are highly detailed documents that take time to complete, and any changes or alterations can significantly extend how long they take.

No, it’s not legal for unlicensed individuals to conduct structural calculations for buildings or building repairs. Not only do licensing requirements prevent DIYers from tackling this project, but mistakes can also be extremely dangerous and put your property and anyone inside or near it at risk of severe injury or even death. You should always hire a licensed and certified local structural engineer to make structural calculations.

Professionals optimize layouts, improve energy efficiency, and ensure structural safety and compliance.

A floor plan is a less detailed illustration showing a building or room's layout from above, including elements like windows, doors, walls, and fixtures. It offers a simplified view for homeowners. In contrast, a blueprint is a more detailed, to-scale architectural drawing that includes all parts of the building plans, such as structural elements, construction details, and utility schematics. While a floor plan can be a type of view within a blueprint, the complete blueprint contains all the necessary details to turn the plan into a reality.

The process typically takes 2-6 weeks, depending on the project size and level of customization.

The Great Falls, MT homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.