We are a locally owned and operated company that values honesty and integrity and treats your home as if it were our own. We offer a variety of General Contractor Home Improvement services that are customizable to each individual project. We specialize in a wide range of expertise for a variety of other projects. We pride ourselves on the quality of our work as well as our commitment to outstanding results. We look forward to building lasting relationships and guarantee your satisfaction!
We are a professional interior/exterior painting company that also offers carpet cleaning, upholstery cleaning, pressure washing, and deck maintenance.
"6/21/2017 – I called United Roofing to get a bid on roof replacement for a small house, 22 squares. Jon McCoy answered and said he would be here to look at the roof on 6/272017. 6/28/2017 I had the written bid in hand. It looked pretty thorough, covered everything we had discussed. I am not in the business and doing the best I can to make sure everything I want is included in the bid. Jon seemed like he knew roofing and he had good reviews. He said that repairing the soffit and fascia boards was not included and added a charge for this after sending him pictures. We agreed to an Additional $1,200 charge. The day of the job, he asked if we had agreed to $800, I said no, it was $1,200. The day after the job, he stated we had agreed to $1,500, I again said no, it was $1,200. Point being – get it in writing. I understood Jon would be providing the wood and labor. I ended up providing the wood just so that the wood matched, otherwise, he was using whatever was available aka scrap. The bid included: a) Tear off all old shingles to the existing wood deck 1 layers You can see from the attached pictures, they first attempted to only partially remove the tar paper and nails. Glad I was on site, Jon was not, and I asked the crew to remove down to wood. I called Jon, he said we do sometimes, sometimes we don’t. So, unless you are there watching, you will never know what you get…. b) Replace all felt underlayment with 30 lb. synthetic type Well, this was completed, but you can see from the pictures – it was completed, but very sloppy. Look at the roof edges. Wood is exposed as the cuts we not very precise. Sometimes they ran the felt through the valley and sometimes not. c) Haul away all old shingles and materials. Well, they got most of it. See (d) below. d) Clean yard of all debris and trash / run magnet I will let the pictures do the talking. Shingles and tar paper is still in bushes and nails in driveway and yard. A box of trash was left in the apartment and chicken boxes left in the yard. e) Replace all vent pipe collars with lead permanent type I do not think this was done. I asked, and he gave me an excuse why he couldn't do it, but would leave collars for the plumbers. I have not found them. The only vent provided was for the ac. However, they disconnected the new ac plumbing to the vent and did not reconnect. **See pictures. f) Install new hot water heater low profile vent (main house) This was not done that I can find. g) Remove and add decking / old existing floor furnace vent (main house) I believe this was completed. h) Install ice and water shield to all valleys I believe this was completed. i) Ventilation: whirly birds (2 on main house) This was completed, but only after I said, where are the whirly birds. Jon did not provide. I made a trip to the local supply house, but they only had one. Jon did supply the next day. j) Install 3- 2x4 rafters, install 3 sheets of decking and add flashing with 1ply base and one ply ice and water (cap sheet ) to back porch extension roof to cover existing step down fascia board to extend under main roof shingles Note: there is a $250.00 charge for item (j) included in the final roof quotes - This was completed but not to these specs. Only replaced one 2x4 and partial decking. I went and purchased a long 10 foot 2x4 and a sheet of decking to finish. One piece of decking fell off the next day – apparently. Maybe the roofers removed but did not replace, I am not sure. **See Pictures Okay, now for the really fun stuff. One of the crew decided to go number 2 in the bathroom. Problem is, the water was turned off and we discovered this the next day. I bought a pale of water over for them to flush. I made no less than six trips to buy supplies that were not supplied on site. Otherwise, they would use what was available – old terrible looking wood. Jon is not on site to oversee the job, he does drop by. He has not come by since the job was completed, to my knowledge. Caveat emptor One of the roofers got stopped by police. I ended up paying the bail bond to get one of the roofers out of jail. I was paid back. Agreement says rotten wood extra - I understood I would pay for the rotten wood decking, the wood, it does not say wood and labor. Typically, in prior roofing jobs I have had, the labor is included but not the wood. Jon brought some scrap wood, looked like from a broken desk, to use for decking. I went and purchased real roof decking to match what we had, but he charged me $425. I already paid for the wood, so I am not sure what this charge is for. The quote included flashing; I understood that flashing or drip rail would be provided. It was not. Jon said if I would buy it, they would install for no additional charge. Yet, he added $100 charge for drip rail installation. They did not want to install drip rail, and did not do a very good job. **See pictures. Other: Left wood nailed up on side of house for ladders - to keep from crushing the drip rail. Summary. I had to spend a lot more time than I preferred - making sure things were done correctly, but overall they did a fair job. When they finished, I made a punch list, they came back and made the requested adjustments. I appreciate that they fixed all the remaining issues without excuses, just jumped in and made it right. I hired a different company to do my next roof and they did a much better job and completed the entire job in two days."
Our company number of employees depends on job size and requirements.(some contractors require a certain number). Our company's billing policy is that we donot ask customers for money to start a job and we donot ask customers for money for labor that we have not completed. We ask customers to inspect the job before paying any money. Our company work well with General contractors, we work as team.
"When I called, we set a date for July 31, 2015. The team arrived promptly and did an excellent job, the best gutter cleaning ever. They were polite, friendly, and efficient. I told the young man who did the actual cleaning that my house was 500 square feet larger than the basic charge, $139 for 2,000 sq.ft. When they finished, the additional cost was $45, which I was quite pleased with. They also cleaned up my deck and patio, which I particularly appreciated. Usually it has been left in a mess, but my deck was clean and my plants survived. Based on my experience, I would be happy to consider Risher and Sons for this and other projects. "
Very knowledgeable painter with reasonable prices. We specialize in interior custom work but we do offer all areas of painting. Backed with 15+years experience. Will travel
We are a small painting business with the man power and skills to take on bigger jobs. We have combined 35 years of experience and our prices are very reasonable.
I have been in business since 2013. I have experience in interior and exterior painting. I have experience in painting Antebellum homes. I can also do any type of wood staining. Please contact me for a quote. I look forward to working with you!
You’ll need to restrain your deck when you notice fading, cracking, peeling, or mold and mildew over a moderate to large area, or when it’s become especially difficult to clean. As for how often to stain a deck, plan to do it every two to three years or whenever you start to notice extended damage.
The best time to paint your deck is when temperatures are neither too cold (below 60 degrees) nor too hot (above 85 degrees). Always paint your deck when there’s no risk of rain. For fast-drying paint like acrylic or latex, ensure your deck can dry for at least four hours. Oil-based paints take longer to dry and may require 48 hours to completely cure.
When choosing between deck stain or paint, knowing what will last longer is important. Deck paint lasts longer than deck stain. With deck paint, you can get up to 10 years of coverage before you need to reapply. With deck stain, that time is significantly shorter at two to three years.
You have a couple of options when choosing a durable pool deck coating. Epoxy is common and offers excellent stain and water resistance. Epoxy also withstands high temperatures and UV lighting, making it ideal for sunny spots. You can also add a coating to cement, which significantly lowers the temperature of the concrete, is environmentally safe, and makes cleanup a breeze.
Here's the deal with leaving used rags covered in oil-based stain lying around in a pile: Depending on the conditions, these rags can take just an hour or up to a few days to combust. The source of ignition is caused by trapped heat that can be compounded if the rags are near a heat source.
The Yazoo City, MS homeowners’ guide to deck staining services
From average costs to expert advice, get all the answers you need to get your job done.
Cedar is a popular decking material, best known for its natural wooden look and resistance to rot. So, how much does a cedar deck cost? Find out in this guide.
Planning a deck staining or painting project? Learn about finish options, average costs to expect, and how to hire the right local pro for your backyard.