Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Carriere, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Carriere, MS?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Carriere

Avatar for Pavement Maintenance Unlimited, LLC
Pavement Maintenance Unlimited, LLC
4.8(
4
)

Serving Carriere, MS and surrounding areas

Approved

In business since 1997

Free estimates

Credit card accepted

"Mike R was a delight to work with. Answered all calls and texts promptly, honest and experienced. His crew was fantastic. They were professional, courteous and hardworking. They had to adjust to using their equipment in a tight space and did it with ease. The job encountered an obstacle and Mike stuck to our agreed budget and fixed the problem. Such a pleasure to work with overall and the driveway looks great. Very happy customer"
Side Lot
Front Lot
Shoulder
Unprepared Crack
Shoulder

+8

Response time4 days
Recommended by100%of homeowners
Avatar for Harris Asphalt Paving, LLC
Harris Asphalt Paving, LLC
4.7(
23
)

Serving Carriere, MS and surrounding areas

In business since 1990

Free estimates

Warranties offered

"They did a great job! Customer service was awesome. When I needed something checked they came very promptly. Very professional and polite, and very fair price! We love our new driveway! It really transformed the look of our whole house!"
Repaving parking lot
2
3
4
5

+5

Response time11 hrs
Recommended by90%of homeowners
Avatar for Clingon Professional Earthworks LLC
Clingon Professional Earthworks LLC
5.0(
6
)

Serving Carriere, MS and surrounding areas

In business since 2023

Free estimates

Small jobs welcome

"The Clingon Professional Earthworks company was hired to solve a drainage issue in which our driveway had been washed out twice before. They reviewed the topography and made a plan. Before the start of the job several workers measured and reviewed the property. Also durning and after the job was completed they were out monitoring the drainage. I appreciated the total commitment to getting the job done right. They arrived each day in the early morning and worked throughout the day. Very professional and made me feel confident we will not be encountering further issues."
Response time2 days
Recommended by83%of homeowners
Avatar for BrewHall Construction, Inc.
BrewHall Construction, Inc.
5.0(
5
)

Serving Carriere, MS and surrounding areas

In business since 2010

Free estimates

"We needed our back patio extended and they were the best quote around. Everyone was very friendly and did the job in less than a day. Very please with the work done and would highly recommend."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by100%of homeowners
...
Showing 1-10 of 147
Asphalt Driveways questions, answered by experts

Depending on project size, typically 1 to 3 days, including preparation and installation.

Building a road on a slope requires careful planning and will normally require a drainage system underneath to prevent flooding and damage to the road over time. Your professional may lengthen your road to create switchbacks if the slope directly to your home is too steep, as there are regulations for maximum road slope. The drainage system will help prevent runoff from the higher side of the slope from damaging the asphalt or concrete. Keep in mind that building a road on a slope isn’t a good DIY project, as a lot can go wrong.

A driveway approach is the part of a driveway where the public road meets the private driveway. This section contains several key elements, including the driveway apron, the curb cut, and the end slope. Depending on the slope of the driveway, this area may also contain the trench drain.

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

Yes, using recycled asphalt millings is an eco-friendly alternative compared to concrete. Millings are reclaimed pieces of gravel that are recycled into aggregate that can be used on driveways, patios, walkways, basketball courts, tennis courts, and more.

The Carriere, MS homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.