Top-rated rototilling pros.

Get matched with top rototilling pros in Belzoni, MS

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Belzoni, MS?

Select your specific project to find the pro for you.

Find Rototilling pros in Belzoni

PDOA, a.k.a. Babin Enterprises

221 Presley Ave
No reviews yet

PDOA, a.k.a. Babin Enterprises

221 Presley Ave
No reviews yet
42 years of experience

We provide Commercial, Marine, and Residential/Recreational construction, repair remodel and demolition services. From the Ground to the roof, and from the waterline to the river or lake bottom. All at affordable pricing as related to the work required by our customers. Contractor quality at handyman prices!

We provide Commercial, Marine, and Residential/Recreational construction, repair remodel and demolition services. From the Ground to the roof, and from the waterline to the river or lake bottom. All at affordable pricing as related to the work required by our customers. Contractor quality at handyman prices!


Rototilling questions, answered by experts

It depends on the model of your pool. You’ll always have to level the topsoil, but most vinyl-lined pools require an additional 1- to 2-inch layer of sand to protect the liner. This way, when a foot kicks down to the bottom of your pool, it’s not scraping the liner against the hard ground. If your pool isn’t vinyl-lined, you can skip this step or add a layer of another base material, like decomposed granite. Always check your manufacturer’s instructions before you begin.

Yes, most services include grading for proper drainage. Confirm with your contractor.

Yes, you can rent a rototiller for around $60 per day and do the work yourself, but it’s not recommended. Tilling is more of an art than a science, as tilling too deep can be detrimental to your soil structure and the organic matter that is beneficial to plants and shrubs, and tilling too shallow won’t properly introduce fertilizer or break up the soil for rooting plants. Additionally, tillers are powerful machines with sharp blades to cut through small roots and soil, so they are inherently dangerous to use. It’s usually worth it to hire a professional rototiller.

Yes, rain can affect the results of a perc test because it will partially saturate the soil and slow down the rate of drainage. Ideally, you should do a perc test during the driest time of the year and try to schedule it after a stretch of days where no precipitation occurs. This will give you the best chance of passing.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.