Top-rated rototilling pros.

Get matched with top rototilling pros in Crookston, MN

Enter your zip and get matched with up to 5 pros

Need a pro for your rototilling project in Crookston, MN?

Select your specific project to find the pro for you.

Find Rototilling pros in Crookston

Richards Forestry

No reviews yet

Richards Forestry

No reviews yet
18 years of experience

TREE SREVICE -PESTICIDE APPLICATOR-EXCAVATING-BOBCAT WORK-PONDS-AND WATER FALLS-YARD SERVICE DOCK SERVICE SHORELINE RESTORATION-RIP-RAP RETAINING WALLS BOULDER WALLS TRUCKING

TREE SREVICE -PESTICIDE APPLICATOR-EXCAVATING-BOBCAT WORK-PONDS-AND WATER FALLS-YARD SERVICE DOCK SERVICE SHORELINE RESTORATION-RIP-RAP RETAINING WALLS BOULDER WALLS TRUCKING


Rototilling questions, answered by experts

Pea gravel is hands down a top pick for managing landscape drainage.  These small stones allow water to flow through easily by creating natural gaps that promote runoff. Beyond functionality, pea gravel also offers visual versatility. Homeowners will find a range of earthy tones like gray, brown, blue, and even red, making it easy to match with different outdoor styles and plantings.

Typically 1-3 days, depending on property size and terrain condition.

A perc test takes an average of around two hours, but it can range from one hour up to around six hours. Perc tests that require wider or deeper holes and those that require multiple holes dug throughout your property will take longer because there’s more excavation involved. The actual filling of the hole and monitoring to gauge the rate of percolation should take under an hour per hole.

Water pooling, uneven surfaces, or basement leaks are indicators.

Not typically. A paver patio drainage problem generally requires a landscaping fix that can include a drainage pipe or dry well capable of handling the amount of runoff in your yard.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.