Top-rated land clearing pros.

Get matched with top land clearing pros in Ada, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your land clearing project in Ada, MI?

Select your specific project to find the pro for you.

TRUSTED BY ADA, MI HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon464
    Verified land clearing services reviews

Find Land clearing pros in Ada

Avatar for Vander Hyde
Vander Hyde
4.3(
363
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For Business

Serving Ada, MI and surrounding areas

In business since 1989

Free estimates

Emergency services offered

"Went OK. They did the work and it 'mostly worked' when they were done. I say mostly because the pressure valve was blowing off of the boiler when they were done (This was NOT happening before they had done the work). I had noticed this the day after I had paid. I contacted them and they wanted to replace the expansion tank and charge me $200. I asked - shouldn't this be covered under the initial work of $4600? They said the part wasn't explicitly in the quote. Frankly at this point to replace what really was a $40 part and half hour of time to do a fully finished job (for $4600). For 1. How am I supposed to know (as a customer) what should be on the quote for a fully finished job (pumps, piping, etc? - they are the expert) 2. How am I supposed to know this isnt their fault. (Shouldnt an autofilling expansion tank be connected to the incoming water supply?) Frankly not standing fully behind their work and making sure they do everything to do a good, finished job - left a 'bad' taste in my mouth. In the end I replaced the auto-filling expansion tank with an Extrol expansion tank for $40 and it took me less than an hour. After that it all appears to work."
Recommended by81%of homeowners
Showing 1-10 of 47
Land Clearing Services questions, answered by experts

Yes, new home construction will always require building permits, no matter where you live. In most cases, you’ll need a general construction permit, along with plumbing and electrical permits for the utility lines in your home. Depending on where you live, you’ll likely find that you also need permits for things like connection to a sewage system or installing exterior components, like decks, driveways, patios, and curb cutouts. Leave navigating the permits required for new home construction to a professional to ensure your home is built legally and safely.

If a buyer pays for a survey, the surveyor they hired will only provide results to them. It’s up to the buyer whether they share the survey results with the seller or not, even if they ultimately walk away from the deal. It’s considered good faith to share the results with the seller, though, especially if you back out of the deal, as the seller can then provide that survey to future interested parties.

To hire a land surveyor, you need to start by searching online for reputable professionals in your area. Here are a few steps to take when making a shortlist:

  • Browse land surveyor service website

  • Check credentials

  • Read customer reviews

  • Find their contact information

  • Call or email to inquire about more information

  • Ask how far they travel, if you’re some distance away

  • Find out how they charge for their services

  • Ask about schedule and turnaround times

  • Repeat these steps for one to two other services and compare pricing

Prior to excavation, you should prepare the dig site and call 311 before you sign anything.

To get your site ready for excavation, you should move anything in the area that isn’t affixed to the land. You can save money on the excavation by removing hardscaping, including walkways, decks, concrete patios, and paver patios.

Before you carry out any digging, you should call 311 to confirm that there are no utility lines running through your excavation site. Skipping this step could lead to severe injury and property damage if your excavator hits a water, sewage, or gas line.

You can’t build on undeveloped land without preparing it for construction, which involves running utilities to the site or accounting for private utilities like wells and septic systems and grading and compacting the soil for safe construction. Once you prepare the land, you can build on it as long as the project abides by local zoning regulations.

The Ada, MI homeowners’ guide to land clearing services

From average costs to expert advice, get all the answers you need to get your job done.