Top-rated concrete leveling pros.

Get matched with top concrete leveling pros in New Meadows, ID

There are 0 highly-rated local concrete leveling pros.

Need a pro for your concrete leveling project in New Meadows, ID?

Select your specific project to find the pro for you.

Find Concrete leveling pros in New Meadows

Twin Falls Concrete

591 Wild Rose Loop
No reviews yet

Twin Falls Concrete

591 Wild Rose Loop
No reviews yet

Since 1979 we have been delivering ready mix concrete to Twin Falls and the Magic Valley. We take the guess work out of concrete ordering and you pay for only what you use. As a Twin Falls concrete contractor, we can now build a driveway, sidewalk, or cement patio from start to finish!

Since 1979 we have been delivering ready mix concrete to Twin Falls and the Magic Valley. We take the guess work out of concrete ordering and you pay for only what you use. As a Twin Falls concrete contractor, we can now build a driveway, sidewalk, or cement patio from start to finish!



Concrete Leveling questions, answered by experts

Yes, you can screw directly into concrete, but only if you use screws specifically made for masonry or concrete. They're often labeled as masonry screws and made of steel and a special thread that provides a strong grip. However, even when using these screws, drilling a pilot hole first will make it much easier. 

The cost of asphalt driveway repair is usually similar to the cost of average concrete driveway repairs, but maintaining asphalt tends to be less expensive on a per-instance basis. For example, resurfacing asphalt costs about $1 less per square foot, but it doesn’t last as long as concrete and will need more frequent repairs. An asphalt driveway lasts 20 to 25 years, but a well-maintained concrete driveway can last twice as long, so the maintenance costs and timeline even out.

You will know concrete is fully cured after 28 days when the new concrete reaches its maximum strength. Follow the cure time information on the manufacturer’s label or ask your concrete pro about when your concrete is fully cured. You can drive your concrete once it’s partially cured, usually around seven days after it’s poured. After one week, the concrete is strong enough to hold up to regular-size vehicles.

Most of the time, you or your contractor will spray the concrete form and framework with a release agent or oil to prevent sticking. This is common practice with wood and steel forms. For insulated concrete forms, the styrofoam formwork often remains in place after construction, so you don’t need to treat it beforehand. Foam concrete forms made out of melamine also may not need treatment beforehand, as the material naturally won’t stick to the concrete after it’s cured.

Yes, it's best to use a carbide-tipped masonry bit when drilling into concrete. These bits are harder and more durable than standard bits, so they're designed for drilling into tough surfaces like concrete. A different bit is likely to break and pose a safety hazard so you'll definitely want to stick with one that's specially designed for concrete. 

By submitting this question, I acknowledge and agree that Angi may publicly display my name, city, state, and question on the website for professionals and others to see.

The New Meadows, ID homeowners’ guide to concrete leveling services

From average costs to expert advice, get all the answers you need to get your job done.