Find top-rated Pros in your area
Enter a zip code and get matched to businesses near you.
Geo Icon
Tower Energy International LLC logo

Tower Energy International LLC

Acoustic Ceiling Tiles - Install, Doors (Interior) - Install or Replace, Brick or Stone Fireplace - Repair,

About us

Additional DBA: Sigma Exteriors.

Business highlights

Emergency services offered
29 years of experience

Services we offer

& gutters, Roofing, all exterior remodeling., doors, fascia, siding, soffit, trim, windows

Amenities

Emergency Services

Yes

Accepted Payment Methods

  • CreditCard
Reviews
3.515 Reviews
Number of StarsImage of DistributionNumber of Ratings
5
47%
4
7%
3
13%
2
20%
1
13%
Showing 1-15 of 15 reviews
Judith S.
May 2011
1.0
$4,000
see above

Barbara M.
Mar 2011
2.0
$22,000
They were the most expensive but we wanted the best - we shopped many window companies - the salesman was great - however, we are unhappy with the costliest part of the project. PS We still have windows that have not been caulked.

Frank S.
Mar 2011
4.0
Yes, I recommend this pro
$200
There was a communication and installation problem due to internal scheduling and the weather. The price was good. The quality of products were outstanding. The installation was outstanding. I am very happy and will most definitely use their service again if they will allow me.

CRAIG W.
Aug 2010
1.0
$200,000
How did it go overall? As I indicated in my rating above it went bad..The "Details of my Experience" add up to an F..Now Angies List has been after this report for some time yet i waited and waited to file it in hopes that Sigma Exteriors would wrap this up.Now I began this remodeling of my home project with Sigma Exteriors in spring of 2009 with estimate and design phase begiinning actually in august 2009..which was later than i was told it would begin..This was the first delay of many over the course of the project which is not completely finished.The reason i am now filing is after talking with the owner about fact a gutter is not fastened and a window trim still remains unpainted for last several months.I get call from his people that they will "do it all at once" when paint comes in or whatever..It was just the last time i could hear the do it all at once line.Now after over a year with these people on an extensive remodel job I am uniquely qualified to file this..I am hesitant to go into the nightmare in too much detail because I want to get it finished and i want my warranties to actually be covered.Needless to say the littanny of problems,delays,excuses,and what not are a long list that i would get into should angies list require it...Suffice it to say that i am not happy had a long year and they are now making it even longer...its (March 1st, 2011) today and my $20,000 plus Weather Shield windows all across the front of my home look absolutely terrible with a weird oily pattern developing on all the glass anytime its around 40 or lower and no other windows in my neighborhood get it at anytime! The 2 pella windows i had put in during the job by another company (Verhalen) are beautiful in any temperature.

Nancy K.
May 2010
2.0
$25,000
It took almost 3 months for this project to be done. In the middle of it, the workers drove a nail through an electrical wire shorting out half of the house, ruining several light fixtures as well as the garage door opener, but they insisted they did nothing wrong. We had to hire an electrical contractor to come out to find and prove that the nail caused the short. The work crew changed every day and some days they would arrive at 9, some days at noon, and some days not at all. They would work about 3-5 hours a day. My husband would point out things that didn't look right, but this was ignored. When the job was finally finished, the boss came around to inspect and said the job had been done wrong. Another crew was brought in who completely ripped off everything that had been done and within 2 weeks, had new all put on. Sigma did pay for replacing the fixtures and garage door opener that was burned out, gave us a deduction on the final cost, and gave us two 2 shirts for the inconvenience. It was a nightmare experience we don't EVER want to repeat.
Response from Tower Energy International LLC
"Sigma Exteriors bypassed its standard processes and procedures leading to the poor construction experience the member has accurately described regarding her project in 2008. Sigma Exteriors completed the project properly and according to our high standards promptly upon the decision to redo both performance and aesthetic components of the siding project. Like many homeowners, Sigma Exteriors was taken advantage of because of trust. The siding crew which was terminated during this project was brought to us by our main supplier at the time and is a relative of their management. This was the first and only project this crew worked on with Sigma Exteriors. Sigma's normal verification of detailed installation experience was bypassed because of the prompting and recommendations by our trusted relationship with the supplier and their promise and guarantee of the crew's experience, training, and attention to quality details and because we were presented with evidence of the crews training certifications for the products being installed of which we later learned were provided to them through sponsorship by the same supplier. Sigma was repeatedly lied to by the crew leader regarding daily and weekly timelines and details of project progression throughout the first phase of the project. Several of the problematic signals were not brought to the production manager's attention as supervisors and the homeowners were told that because the project was in-process the details in question would be fixed and completed properly prior to job finish. This is the same story the crew leader we later learned had been telling the homeowners in an attempt to shield everyone from reality. Sigma Exteriors immediately took action to remedy the scenario when the realities of the project were brought to the attention of the executive management team. The crew was immediately terminated, a project assessment was completed by senior management and an outside consultant created a punch list, and then prompt action was taken. The project was taken apart and re-installed to ensure all performance and aesthetic components would be completed to the highest professional standards. Sigma Exteriors business model methodology is derived from the "six sigma" model of standardized processes and procedures and focus on a commitment to constant and never ending improvements to eliminate errors and create efficiencies. The crew was terminated as well as the production supervisor overseeing this project and Sigma tightened the processes internally to firewall similar scenarios from occurring. Sigma Exteriors greatly regrets enabling the poor construction experience described by the member in 2008 and is committed to following our processes and procedures to ensure consistent and reliable results for all our projects and the best possible construction experience. Sincerely, Matt Snyder President"

MARK F.
Jul 2009
5.0
Yes, I recommend this pro
$150
They replaced a small attic window that we had difficulty getting someone to come out and take a look at it. They built an aluminum window and installed it for us. They had to come into the house to install the attic fan and the dog was here and it did not have any problem with him and he did not have a problem with it, which was unusual.

MARK F.
Jul 2009
5.0
Yes, I recommend this pro
$45,000
It was an excellent experience. We went with them because the guarantee and because of the service they provided. They sent someone out and sat with us just ahead if their crew and discussed everything that was going to happen over the weeks that they were going to be here. They talked with us at the end of everyday and let us know what they had done and did excellent clean up. They also replaced a small attic window and one built an aluminum window and installed it. They also had to replace the gutter. They did a great job and I was surprised with how much interaction they had with us before they started the job and the care they took. They had to come into the house to install the attic fan and the dog was here and it did not have any problem with him and he did not have a problem with it, which was unusual.

MARIA R.
Jul 2009
3.0
$9,000
They representative came and spent two hours with me and he ordered the wrong ventilation equipment. I got charged with that. They are probably good for big companies but I don't reccomend them for smaller home owners. I had to ask them to seal off side vents. You have to watch their work step by step.
Response from Tower Energy International LLC
"Various ventilation options were discussed with the customer both intake and exhaust. When the contract was drawn up the intake ventilation was overlooked by accident. It should be noted that the customer was not charged for the modifications to their intake ventilation in the original contract. The on-site project manager noted that the intake ventilation needed to be corrected and approached the customer on how they wanted to proceed. When the Project Manager understood the oversight in the contract Sigma offered to split the cost of the Intake Ventilation Modifications. While we are sorry that there was an initial oversight in the original contact our system of checks ensured that the customer was not left with a substandard roof installation."

Nancy S.
Mar 2009
2.0
Yes, I recommend this pro
$1,250
1st took 4 months from order to install; didn't come with the ordered hardware and had to call someone. Installers uneducated on storm door install and didn't bother to read instructions on closer and did it incorrectly. Left huge gaps and several drafts in the install along with much damage to wood frame and wall. Sigma had to come and do a temporary install on hardware as this was on a Sat and no one available. Also came out 2-3 more times fixing all the problems with the install. Damage to the door frame, which includes exposed nail heads, splintered wood chunk missing, horrible caulk job, sections of dry wall ripped down 2 layers (brown paper is exposed) flaps were they tried to match up the chunks of drywall that were ripped off due to their failure to cut all the way through around the frame for removal. Disclosure statements indicate there may be damage for a door install, just didn't expect the wall to be 'ripped off'. While I may use/recommend them for windows as have had no issues with that, will not use or recommend for door install. Have another door to be replaced and will definitely use someone else.
Response from Tower Energy International LLC
"As the customer was growing impatient, we had a representative from our supplier drive over 200mi to pick up the door from the manufacturer. This was done in order to install the door on a Saturday per the customer’s request. The customer was aware that the hardware ordered was not available at the time of installation and a temporary set would need to be installed for the time being. The project agreed upon, was of a “replacement door” project. This means that only the original door slab gets replaced. The original framing from the 1928 home stays in place and is usually chosen by a homeowner with a specific budget in mind. As the customer stated, it is stated in the contract that there may be damage to the existing walls, interior casing and door frame. When removing and reusing the interior casing, there is no possible way to remove the casing , without causing some damage. The wall in no way or manner was “ripped off”. The areas around the interior casing were scored with a razor knife before removal. As this house was built in 1928, there were several thick layers of paint and drywall that had been installed over the plaster walls. There naturally was some chipping of plaster and paint. When the production department received the complaint on Monday morning, we had someone come out that very day, and inspect the issues voiced by the customer. Even though the slight damage had been discussed prior to installation, Sigma made the 2-3 trips necessary to completely fix the customer’s issues. This was far above and beyond what had been agreed to contractually. The storm door was a homeowner supplied door that the installers were unfamiliar with and therefore, had problems with the closer mechanism of this particular brand of door. Since the time of this complaint, this customer has purchased another remodeling project with Sigma. Sigma always has and will continue to provide an exceptional customer service experience."

Lawrence C.
Dec 2008
5.0
Yes, I recommend this pro
$20,000
There were a couple issues, but they were handled quickly, professionally and to our satisfaction.

WILLIAM M.
Dec 2008
5.0
Yes, I recommend this pro
$3,000
The price was good compared to others. They gave us an estimate. They did a follow up on the work they did. They cleaned any mess they made. They were friendly.

Nancy S.
Jul 2008
5.0
Yes, I recommend this pro
$10,000
Had 3 windows and an exterior storm door installed in fall 2007. A few finishing issues which I put in writing to them. They were responsive to that and inspected and agreed with my assessment stating not up to their standards. Ordered 11 more windows for install (in the process). Took care of two of the fall issues and will return to finish up outside trim and complete final fall install issues. Clean up was excellent and took care not to damage new plantings in front of house. Have six windows to go and will use Sigma. Explained anything that needed to be done, such as blinds removed and how long to wait before rehang to allow caulk to set.

KATHY H.
Oct 2007
3.0
$400
After paying the bill for $400 and still having a leaky roof my husband went up there which we probably should have done in the first place and saved ourselves $400, found a space near the dommer, caulked it and so far no more leaking. Now there is inside water damage which must be fixed, tearing down ceiling to replace insulation. I contacted several other roofing contractors and they said that they guarantee their repair work for 90 days and they weren't on Angie's List. Am disappointed as we thought that joining Angie's List would avoid problems like this.
Response from Tower Energy International LLC
"WE INITIALLY RESPONDED TO A SERVICE CALL IN OCTOBER 2006 AND PERFORMED REPAIRS AT A CHIMNEY. THE CUSTOMER WAS SATISFIED AND WAS CHARGED AT $150.00 BECAUSE OUR ESTIMATOR PERFORMED THE REPAIRS ON-SITE HIMSELF. ON SUNDAY, 8/17/07, AT 8:25 AM, WE RECEIVED A CALL FROM THE CUSTOMER THAT THEY HAD NEW LEAKS AT A PORCH. OUR OFFICE CALLED THE CUSTOMER RIGHT AWAY AND SCHEDULED A SERVICE PERSON TO PERFORM A REPAIR IMMEDIATELY. THE SERVICEMAN PERFORMED TEMPORARY REPAIRS, BUT DID NOT HAVE ENOUGH MATERIALS TO COMPLETE THE REPAIR. WE RETURNED THE FOLLOWING WEEK AND COMPLETED THE REPAIR. ALSO, WE PERFORMED ADDITIONAL FREE REPAIRS (REPAIRED THREE SHINGLES ON A DIFFERENT SECTION) WHERE THE INITIAL INSTALLATION OF THE ROOF WAS FAILING TO TRY TO HELP THE CUSTOMER. THE ROOF IS NOT VERY OLD, BUT THE INITIAL INSTALLATION WAS NOT PERFORMED PROPERLY OR WE WOULD NOT HAVE HAD TO PERFORM REPAIRS. WE RECEIVED A CALL FROM THE CUSTOMER ON 9/11/2007 THAT A LEAK WAS STILL THERE. WE SENT THE SERVICEMAN OUT TO PERFORM REPAIRS THAT DAY, BUT THE ROOF WAS TOO WET TO FIX. THESE REPAIRS WERE NOT IN THE AREA THE CUSTOMER PAID FOR. THE CUSTOMER WAS DISGRUNTLED AND DIFFICULT TO DEAL WITH. WE THEN GOT A NOTE THEY WERE TAKING THEIR BUSINESS ELSEWHERE. WE DID NOT CALL TO FOLLOW-UP BECAUSE THEY ASKED US NOT TO. FACTUALLY, THE CUSTOMER HAD AN IMPROPER ORIGINAL INSTALLATION OR THIS WOULD NOT BE A PROBLEM. THE CUSTOMER SAID THEY FOUND A LEAK AT THE DORMER. WE NEVER SERVICED THE DORMER."

KATHY H.
Oct 2006
5.0
Yes, I recommend this pro
$150
I contacted the company and they had a representative out to the house the next day. After he went up on the roof and did an inspection, located the problem, and fixed it all within 30 minutes. Very pleased with their response time and work done.

MICHAEL R.
Oct 2006
5.0
Yes, I recommend this pro
$12,900
Great job and great warranty.

Licensing

State Contractor License Requirements

All statements concerning insurance, licenses, and bonds are informational only, and are self-reported. Since insurance, licenses and bonds can expire and can be cancelled, homeowners should always check such information for themselves. To find more licensing information for your state, visit our Find Licensing Requirements page.

*Contact business to see additional licenses.

FAQ

Tower Energy International LLC is currently rated 3.5 overall out of 5.

Tower Energy International LLC accepts the following forms of payment: CreditCard

No, Tower Energy International LLC does not offer free project estimates.

No, Tower Energy International LLC does not offer eco-friendly accreditations.

No, Tower Energy International LLC does not offer a senior discount.

Yes, Tower Energy International LLC offers emergency services.

No, Tower Energy International LLC does not offer warranties.