Find top-rated Pros in your area

Enter a zip code and get matched to businesses near you.

Do It All Construction

Ceramic Tile

Reviews

1.01 Reviews
Number of StarsImage of DistributionNumber of Ratings
5
0%
4
0%
3
0%
2
0%
1
100%


Rating CategoryRating out of 5
quality
1.0
value
3.0
professionalism
1.0
responsiveness
1.0
punctuality
1.0
Showing 1-1 of 1 reviews

Judith N.
08/2011
1.0
ceramic tile
  + -1 more
The job did not go well. Chris Martino, President of Do It All Construction, began work on May 10, 2011. He and his man worked through the 13th and finished up on the following Monday. The master shower floor was replaced to level the floor properly so water would go down the drain as it should. They were late every day by at least an hour, sometimes by several hours. He was distracted with what sounded like personal busness on his cell phone. After moving back into the shower and using it for about 3 days, the grout started crumbling and the glue oozing out around loose tiles. He came out on May 25th to fix the floor. He replaced only the handful of tiles that were loose and assured me the rest were set hard. After 3 more days of showers, it began to crumble and ooze again. He came out on June 1st to fix the floor - again only working on the handful that were loose. This was repeated on June 10th and again on June 27th. Each time the grout crumbled and the tile oozed. Chris kept telling me he didn't understand what was happening, but clearly he used a bad product to glue the tiles down. Instead of replacing the whole floor again and scraping off the bad glue, he chose to fix a couple of tiles each time. I started calling him on July 5th and left multiple messages for him about the floor. In the final message I asked him to return my money so I could find someone else to fix the floor. To date, he has opted NOT to take or return my calls. The shower is quite unusable now because of the crumbling grout and oozing around the tiles. Even the previous guys didn't have any trouble getting the tiles to stick. Even though the floor was not level, it could be used.
Description of Work: Do It All Construction was asked to replace the ceramic tile floor in the master shower. Two years ago, the previous contractor had left a dip in the floor preventing drainage of the water. They had then gone out of business. The shower was usable, but using my feet to squeegy water got old.

Rating CategoryRating out of 5
quality
1.0
value
3.0
professionalism
1.0
responsiveness
1.0
punctuality
1.0

$1,660

    Contact information

    Paddington Ct, Manassas, VA 20110


    Licensing

    State Contractor License Requirements

    All statements concerning insurance, licenses, and bonds are informational only, and are self-reported. Since insurance, licenses and bonds can expire and can be cancelled, homeowners should always check such information for themselves. To find more licensing information for your state, visit our State Contractor License Requirements page.

    *Contact business to see additional licenses.


    Service Categories

    Ceramic Tile

    FAQ

    Do It All Construction is currently rated 1 overall out of 5.
    No, Do It All Construction does not offer free project estimates.
    No, Do It All Construction does not offer eco-friendly accreditations.
    No, Do It All Construction does not offer a senior discount.
    No, Do It All Construction does not offer emergency services.
    No, Do It All Construction does not offer warranties.

    Contact information

    Paddington Ct, Manassas, VA 20110