Dawson Foundation Repair only installs Bell Bottom Piers because it is the Highest Quality foundation repair method available in Texas - a time-tested, proven, and permanent solution. We have 600+ testimonial letters online. We serve Dallas, Houston, Plano, Sugar Land, Austin, and other Texas cities. The Bell Bottom Pier method of foundation repair is far superior to other methods on the market. Other methods are faster and cheaper, but like with anything else in life you get what you pay for. When compared to the common pushed pile or concrete cylinder, the Bell Bottom Pier offers a load capacity 5.8x greater and a footprint area in stable soil that is 13x greater. Most customers want a permanent solution from a company that has been in business for decades with excellent BBB ratings and reviews and that's what Dawson Foundation Repair provides. Free Inspections for homeowners and lifetime transferable service agreements on all repair work. For homes involved in a real estate transaction there is a $250 fee for an inspection and estimate.
Business highlights
Services we offer
Bell Bottom Piers - 5.8x greater load capacity compared to concrete cylinders Bell Bottom Piers - "footprint" or foot area in stable soil is 13x greater than standard concrete cylinders Bell Bottom Piers - preferred by Structural Engineers Bell Bottom Piers - time-tested, Permanent, Proven
Amenities
Emergency Services
Yes
Accepted Payment Methods
- CreditCard
| Number of Stars | Image of Distribution | Number of Ratings |
|---|---|---|
| 89% | ||
| 9% | ||
| 2% | ||
| 0% | ||
| 0% |
Was not sure how expensive this would be but was very happy with the quote.
The crew was very nice, arrived on time, explained what they were going to do and cleaned up after them selves very well.
I was very pleased with the service.
Doing the process in the late fall probably helped us save our plants. Going through the transplant process in the summer here in Houston, we might have had more casualties.
We compared pressed pilings and bell-bottom piers, and selected Dawson to do the bell-bottom piers rather than another company for pilings, because we felt the piers were a better solution, and Dawson worked with us to provide more piers for a competitive price than the piling company had recommended. Our house did not have major foundations problems, but we had doors that would no longer close, multiple cracks in drywall, and over 2" of settling in some places. We were very happy with Dawson's work, and also with the contractors they recommended: one to do the hardwood floor repair where piers were put inside, and a plumbing company to do the hydrostatic testing (and ultimately needed replacement of cast iron pipe) after the foundation was repaired.
Everything Dawson told us they would do, they did. I particularly appreciated that they worked with us in the bid process to trim the number of piers back to help with cost, but without sacrificing stability. In the end they did almost twice the piers for only a little more than the pressed pilings bid we had gotten. In reading reviews here in advance, I read that some people said they seemed to cut corners based on what they advertise they do. This was not the case on our job; they delivered what they promised.
We also liked that they worked with us and the floor company when locating the piers, to try to reduce or make easier the amount of flooring that would need replacement. For example, once pier excavation began, they determined they could locate some piers so that our kitchen floor would not need to be disturbed. They located other piers in closets.. They even eliminated a pier or two once the excavation began, when they determined they were not needed.
They did do the soil testing that was advertised, and found in a few places that they could not go the promised depth without hitting sand which would not be stable for the pier. We were informed of every step and shown the soil tests. An independent engineer inspected the piers before pouring and agreed with the depth decision on the "shorter" piers.
We coordinated very closely with every person and crew chief, and were on hand or easily accessible for most of the work. That helped with things like making on the fly decisions about pier locations and depths.
We liked and appreciated the professionalism of everyone we dealt with at Dawson. They are very busy; things did slip through the cracks, sometimes emails were not carefully read or the right hand didn't know what the left hand had promised. But any slippage like this was immediately resolved; just be very thorough with your communication and followup.
Every crew was on time. All crews cleaned up; the drilling crew won the prize for cleanliness, amazing considering that they were drilling and hauling yards and yards of clay out of almost every room in our house. The leveling crew was the least neat, mainly in terms of a little trash from the workers left in the yard.
Things to know:
Not including the bidding process you will have three different crews to work with, four if you end up needing plumbing replacement or repair. Each crew has a different chief. Get to know these guys, they were each wonderful to work with. Double check everything you asked for or were told in advance with the crew chiefs; occasionally they were not aware of special requests made through the office. They all went out of their way to make the experience a good one for us as much as possible.
We were told we might have collateral damage such as divots in the ceilings or scraped paint, on the inside work. This is due to the drilling rods. We did have this damage, though nothing major.
It was suggested that we not repair sheetrock for a few months after the foundation repair, in order to let the house continue to settle.
If you work at home or choose to be home during the drilling or leveling, invest in earplugs or good noise cancelling ear protection. But it's very useful to be there when questions come up, if you can stand it.
Coordination between the other companies and Dawson (floor repair and plumbing) will be your responsibility, but Dawson was quite helpful in working with them for scheduling. Just check to make sure both sides know what the dates of work are.
You will be living with open holes in the floors and/or exterior beds or concrete for 10 or more days, after the piers are dug and while the concrete cures. They provide plywood to cover the holes, but this is a multi-week process, so just be prepared for your house not to be back to normal for a while.
The work comes with a transferrable warranty and there are steps that need to be taken if you sell the house to make sure the warranty transfers. Read the paperwork.
One last note: they provide their own form for you to review their work after it is done. On our review we noted that, after the leveling process, we found our outdoor patio umbrella had been broken. We had no idea which crew had done it; it was the only damage that was not inherent to the foundation work. If we'd found it earlier we'd certainly have mentioned it to a crew chief, but I never expected any action on it. The day after turning in our review, I was contacted by the company with an apology and the offer to replace the umbrella. This was an 'above and beyond' moment that typifies what they were like to work with.
We hope NEVER to need their services again but if we do, we'll contact them. We've already recommended them to others.
The first day they dug out the holes, poured the concrete, etc. I was not able to take off from work that day but by the time I got home everything was cleaned up. No mess. A few weeks later Jose (I believe that was his name) came out with his crew and leveled the house. He was very nice and answered all my questions including questions I had from phase 1 of the install. Everything was raised 1" and the expansion joint closed up quite a bit. Before they leveled it I was able to put my thumb in the joint after they leveled I had a normal expansion gap. They cleaned everything up and left - no mess left behind.
A few things:
1) New cracks appeared inside my house after leveling (around my window by the kitchen and the wall in my living room)
2) The brick/mortar on the other side of my house (Left side) has moved and some of the bricks are now loose.
3) The expansion joint (on the right side of the house) towards the top has now opened up some more. After it was leveled the entire expansion joint gap was even all the way up and down
4) Some of the foundation gaps inside my garage closed up but not all of them
5) Fracture cracks on the outside of my foundation were closed a little but but they are still visible. I knew this would happen so no biggie - It's a cosmetic issue now.
I waited a while to post this because I know the house would have to settle a bit. I am concerned about the left side of my house I don't know if this was caused by the leveling. All the 3 foundation companies had told me that my left side was fine - no work was needed there.
For now I'm going to let it sit awhile and if things continue to move I will call Dawson to come out and take a look.
Everyone I talked to was extremely nice and they answered all my questions. I have pictures too I will try to get them all together so I can upload them.
Hope this review helps!!
They were very professional, prompt, thorough, and neat. I was impressed with their efforts to make sure they got the piers in the areas most needed. I would definitely recommend them even though they are a little pricey and they are always at least 6 weeks out on their jobs. I felt like I got what I paid for and was glad I looked at 4 other foundation repair companies before making my decision. Their procedure takes a little longer because they have to let the concrete cure10 days before actually adjusting the foundation but I feel it is the best method out there for Houston soil.
A work: The first team of 6 led by Cesar dug all the holes, both interior and exterior, in a thoroughly professional manner, despite cold, icy weather. The production manager, field manager, and structural engineer were onsite as needed as well. Existing hardwood floors leading to interior dig areas were amply protected by cardboard, hardboard, and very heavy plastic. Even the walls were covered. The cement dust was well controlled with a virtual tunnel of tarp and plastic sheeting. All dirt was removed to the driveway for the duration, and picked up twice - once after the first boxes were dug, and again when the holes were augured to their final depth. Extreme cold delayed the concrete pours a bit, but all work was completed in 5 days, Mon-Fri (interior work only 2 days), with the final cleanup done on the Saturday. Cesar's team worked very hard and waited with good attitudes for inspectors, concrete deliveries, and dirt removal. Exterior damage was minimal and contained in areas where piers were dug. Since we did not intend to keep the plant matter which was removed, we cannot comment on how restoration would be, but the remaining plants are in excellent condition, as is the yard which was protected by a path of overlapping boards. The yard was thoroughly raked to remove mud clumps. The driveway and walks were washed to remove mud. We were able to remove the hardwood floors and expose the cement prior to the crews interior work, so our permanent damage was limited to the travertine tile around 3 piers in the bathroom. Only necessary tiles were broken.
B work: The lifting crew was professional and the job was finished in one long morning - lifting, hole filling, concrete in slab areas, clean up. No damage was done to windows and cracks in ceiling were significantly reduced. We were very pleased with the results with a level floor, ceiling gap greatly reduced and doors that work properly. The lifting team lost points with us for three reasons: 1. One patio pier was not covered properly with concrete and is still a muddy slush. 2. Most importantly, we were told that the loud noise we heard during lifting was a jack that slipped, when I'm sure they knew that it was pipes breaking. The breaking part is understandable and unavoidable, but since we didn't know, we ended up flooding the laundry room during washing several days later and had to repair floor damage there unnecessarily. We appreciate clear, honest communication. 3. Mud and sand was force washed into the pipes and severely clogged the good part of the sewer pipe.
Advice for you, (or things we wish we knew in advance): --Make sure you leave your car/s out since the driveway is needed for a massive amount of dirt. --Stock up on Febreeze, Sensi, and Glade since the house smells like a crypt during the 3 week concrete curing time. --The wonderful plastic sheeting tunnel that protects your house may close off your stairs stranding you up or down stairs. Prepare accordingly. --If the crew stops working and seems to be sitting around, it's because they have to wait for someone, or something. They are paid per pier and try their hardest to finish quickly. --Many people are having this work done and many teams are working all over the city, so it will take a LONG time for the work to begin. Also, get your start date in writing. --Once it starts, it is intense, but it takes time for the concrete to cure so there is a rest period in the middle.
Licensing
State Contractor License Requirements
All statements concerning insurance, licenses, and bonds are informational only, and are self-reported. Since insurance, licenses and bonds can expire and can be cancelled, homeowners should always check such information for themselves. To find more licensing information for your state, visit our Find Licensing Requirements page.