Larry arrived on time with his assistant (son ??) He explained everything in detail and provided me with several options in the installation of the switch, placement of fan, etc. The $225 job was reduced to $200 based on Angie List online coupon.
They cleaned up and vacuumed the area, and were professional in all aspects of the job.
I highly recommend this contractor, and will refer him to neighbors and friends.
Work was scheduled based on the generator availability from the vendor (~3 weeks from 'green light'). Installation of these generators is a multi-day, multi-contractor (electrical and plumber/gas) process. Dont think it's a couple hours of labor on one day!
Day 1 - Preparing the plot where the generator would be installed. LWB&S prepared the plot with extreme care for my lawn and landscaping. They even replaced sod they needed to pull in order to appropriately level and set the concrete. (1/2 day then left to allow prepared plot to set before installing).
Day 2 (next day)- Installed generator outside and mounted panel by main electrical panels in house. (all day ~6 hrs.)
**Note: my biggest headache for this whole process was not LWB&S, but rather the plumber/gas company. Because of licensing and code requirements, LWB&S were not qualified to perform the gas hookups required to provide a fuel source for the generator. The only delays in the project was due to the gas company schedule to make the appropriate hookups from my LP tank.**
Day 3 (~3 Weeks from D1 due to gas company) - Upon completion of the gas hookups, LWB&S were back out within days to compete the final hookup which included drilling a hole in the foundation to run the conduit from the main breaker switch out to the generator, transfer all circuits to be backed up to the gnerator panel, perform a final start up and give me a brief rundown of the equipment.
Day 4 (~1 week from D3 due to availability from the County Inspector) - Final inspection from county and certification. Due to this work being performed around the Chrsitmas and New Year holidays, the county inspector was slightly delayed. I never had to call the county for ANYTHING (permits, inspections, etc.) LWB&S takes care of all that!
All in all, I had an extremely positive experience with Larry and LWB&S in general. For a job as expensive as this ($6,000+) I expected top notch service and received nothing short of exactly that. I will be calling LWB&S for any/all electrical work in the future.
Thanks Larry!
Licensing
State Contractor License Requirements
All statements concerning insurance, licenses, and bonds are informational only, and are self-reported. Since insurance, licenses and bonds can expire and can be cancelled, homeowners should always check such information for themselves. To find more licensing information for your state, visit our Find Licensing Requirements page.