Top-rated rototilling pros.

Get matched with top rototilling pros in Granite, OK

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Granite, OK?

Select your specific project to find the pro for you.

Find Rototilling pros in Granite


Coats Lawncare & Landscaping

1.00(
1
)

Coats Lawncare & Landscaping

1.00(
1
)
27 years of experience

We are the safe and the clean company. Day or night we take care of business. We have 4 employes. We don't sub-contract any of are jobs. We are straight forward (no beating around the bush) if we can't do our job we will tell you. My word is good as gold. We are the one you want! Thanks!

We are the safe and the clean company. Day or night we take care of business. We have 4 employes. We don't sub-contract any of are jobs. We are straight forward (no beating around the bush) if we can't do our job we will tell you. My word is good as gold. We are the one you want! Thanks!

Rototilling questions, answered by experts

Grading refers to the sloping of your yard away from your house’s foundation. It’s a landscaping term you probably know well if you’ve ever had to push your lawn mower up a steep slope.

Leveling is the solution to grading issues since it involves making your yard flat and smooth (and easy to push a lawn mower through).

Improved drainage, garden aesthetics, and protection from moisture damage.

When leveling the ground for a pool. If the ground is mostly level, you may be able to simply lay down pavers or pool pads to support the pool. However, you’ll still need to level the ground with sand as a base before adding other materials on top, like crushed gravel.

It depends on the model of your pool. You’ll always have to level the topsoil, but most vinyl-lined pools require an additional 1- to 2-inch layer of sand to protect the liner. This way, when a foot kicks down to the bottom of your pool, it’s not scraping the liner against the hard ground. If your pool isn’t vinyl-lined, you can skip this step or add a layer of another base material, like decomposed granite. Always check your manufacturer’s instructions before you begin.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.