Meade's Paving
About us
15 employees. No subs. Cost is determined by the job. No travel charges. No service charge. May contact through e-mail.
Business highlights
Services we offer
Residential, commercial & industrial municipal paving and coating striping, resurfacing & driveways
Amenities
Free Estimates
Yes
Accepted Payment Methods
- CreditCard
Number of Stars | Image of Distribution | Number of Ratings |
---|---|---|
65% | ||
6% | ||
12% | ||
12% | ||
6% |
I always let my reviews simmer as I want to let time act on the service and materials of a job.
Initially there were some timing issues, but this is a smaller business (that is a good thing) that got very busy really quick. They gave me an initial estimate and was the lowest bidder with the best (most) materials. After the extension to our parking area was complete we let it rest a season before top coating and it looks great. They did an excellent job and we recommend them to everyone who inquires about our driveway.
Rick and Bob tell it like it is and their advice was spot on as I researched it. Other’s companies seemed to think I would not check on what they were trying to pass off, these companies wanted way more money and typically offered less base and topcoat.
Bottom line I work too hard to throw my money away and I will typically walk away from a project until I feel safe before jumping in. Meade Pavement will get my future business, should I ever need anything else done.
Our old drive was probably original to the 1930s home and in replacing it Meade's had to solve many problems. It is shared, running near both houses' foundations and they had to protect both with careful grading. Our neighbor's and our garages were originally built at a lower point so again the grading had to be carefully done to direct rain water away and to the street. There is a large pine near the end of the drive whose roots were encroaching and this had to be dug out much more deeply with a special sheeting put down to protect the new drive from the water that would naturally accumulate in connection with the tree's roots.
It was amazing to watch the crew work with such finesse to dig out the old asphalt and slabs of concrete while protecting the structures all around them. Rick insists on the first grade of gravel to be compacted and allowed settle for at least two weeks with at least one good rain to make the best foundation before the final grade of gravel and asphalt are put down to finish. This was done.
After the drive was finished Meade's was quite responsive in getting back with me when I had concerns about how it would drain with the first heavy rain. Bob came out to explain how the grading would work. It has worked beautifully.
The driveway also looks beautiful.
They are experts and artists in their work.
Licensing
State Contractor License Requirements
All statements concerning insurance, licenses, and bonds are informational only, and are self-reported. Since insurance, licenses and bonds can expire and can be cancelled, homeowners should always check such information for themselves. To find more licensing information for your state, visit our Find Licensing Requirements page.
*Contact business to see additional licenses.