Barney wrote a new contract saying he was in charge of remodeling the two bathrooms. Barney?s definition of remodeling includes gutting everything but not putting it back. He stated that he would put everything back except for the fixtures. He labeled the toilet and sink as fixtures so he wouldn?t have put those back. In the contract he stated that his painter would prime and paint the ceiling, trim, and door, however Barney only instructed his painter to paint one side of the door. In the contract Barney stated that he would install a Schluter heated floor and thermostat. Barney did not put in the thermostat and he had us purchase and install the necessary measuring tools and to the test for the 25 year product warrantee. The biggest and most costly thing was when he was building the showers. He was told and saw during the walk through, that there would be glass doors that would need to go back in after the shower was rebuilt. He did not accurately check the measurements before demolition. The measurements were not correct and when he rebuilt the shower opening it was too small. As a result I am forced to purchase another door. Barney told me that he was not responsible for the height and clearing of the door and that it was the plumber?s fault. He refused to put the sink or the toilet back. Bakai said "this is a fixture." A sink and a toilet are furniture I reminded him! (our plumber/electrician was ready to install both ASAP) I pleaded with Bakai to put in the sink and toilet in the Master bathroom. I told Barney that I only wanted his worker Derick to install the tile in the bathrooms and he did a beautiful job in the Master Bathroom. Barney installed the tile in the guest bathroom and installed it incorrectly including the bull nose tile. He texted and called several times and was completely unprofessional. He was abusive and threatening and even threatened to walk off the job several times. DRYWALL INSTALLATION IN BOTH BATHROOMS WAS NOT COMPLETED CORRECTLY AS A RESULT: THE PLUMBER/ELECTRICIAN IS UNABLE TO ATTACHED TOWELS BARS, TOILET PAPER HOLDER, MIRROROS, SHELVES ETC. THE SCREWS ARE ALL POPPING OUT BECAUSE THE DRYWALL IS NOT FLUSH ?TIGHTENED TO THE STUDDS IN THE WALL!! IN ADDTION BATHROOM VENT WAS NOT INSTALLED BY BAKAI, AND VENT DOES NOT FIT THE DUCYWORK ---- ALL NEEDS TO BE REDONE AS WELL!! THE SEALANT IN THE GUEST BATHROOM WAS NOT DONE CORRECTLY, AND AS A RESULT IT IS BLOTCHY WHEN ATTEMPTING TO CLEAN IT. IN RESPONSE TO BAKAI: THE OTHER CONTRACTOR WAS HIRED FOR THE JOB AS A PLUMBER AND ELECTRICIAN. BAKAI AGREED SINCE HE DOES NOT DO PLUMBING AND ELECTRICAL WORK! BAKAI AGREED TO TILE AND PAINT - UNFORTUNATELY ALL THE PAINT IS NOW PEELING SINCE IT WAS NOT SANDED, PRIMED AND PAINTED CORRECTLY. REMODEL MEANS TO PUT THE FURNITURE BACK IN THE BATHROOMS. A TOILET AND A SINK ARE CONSIDERED FURNITURE- WHICH THE PLUMBER WAS ON STAND BY READY TO HOOK UP ASAP. THE LIGHTS, SWITCH PLATES, MIRRORS, TOWEL BARS ETC. ARE FIXTURES!! INSTALLED BY OUR PLUMBER/ ELECTRICIAN! THE 60 YR OLD MARBLE 2 INCH THRESHOLD IN THE MASTER BATHROOM WAS REMOVED BUT NOT REPLACED AS AGREED UPON WITH BAKAI- INSTEAD HE INSTALL A CHEAP THIN METAL STRIP. NO LIES WERE TOLD TO BAKAI ONLY THE TRUTH WHICH BAKAI DOES NOT WANT TO HEAR. MY INSTRUCTIONS FOR BOTH BATHROOMS WERE COMMUNICATED IN A VERY DIRECT CLEAR MANNER. UNFORTUNATELY BAKAI CHOSE NOT TO LISTEN TO ME. FOR THE RECORD THE PLUMBER/ELECTRICIAN WAS NOT THE BOSS OR A CONTRACTOR ON THIS JOB! UPDATE 4/5/2016: WHEN WE FIRST TURNED ON THE WATER, IT IMMEDIATELY STARTED SPREADING UNDER THE TILE IN THE FLOOR. THERE IS ALSO NO BULLNOSE ON THE SHOWER CURB WHEN YOU STEP INTO THE SHOWER - THAT MEANS IT'S LITERALLY JUST SHARP, RAW GLASS TILES. IT'S IMPOSSIBLE TO USE THE BATHROOM. THE FLOOR IS POROUS TO WATER, THE SHOWER IS UNSAFE TO USE, AND THE FLOOR IS NOT SEALED CORRECTLY. YOU CAN SEE THE WATER SETTLED IN PUDDLES UNDER THE SHOWER FLOOR AND THE BATHROOM FLOOR, SINCE IT'S CLEAR GLASS TILE. IN THE BATHROOM THEY DID FOR US IN 2014, THEY SEALED IT CORRECTLY, WHICH YOU CAN TELL BECAUSE THE WATER BEADS RATHER THAN BEING ABSORBED INTO THE FLOOR. THAT DOESN'T HAPPEN ON EITHER OF THE SHOWERS THEY JUST DID FOR US, WHICH SHOWS THEY WERE NOT SEALED CORRECTLY. BAKAI OFFERED TO COME BACK TO FIX HIS WORK, SHOWING HE MADE SOME MISTAKES. BECAUSE OF HIS THREATS AND THE FACT THAT I HAD TO GO TO THE POLICE FOR PROTECTION, HE IS NO LONGER ALLOWED ON THE PREMISES, SO THIS IS NOT AN ACCEPTABLE SOLUTION.