Welcome to Next Level Energy! With over 15 years of experience, we take pride in the quality of work and customer satisfaction that we give each and every customer! We are known to pay exquisite attention to detail, while making customer satisfaction our top priority. Call us today to learn more about how we can help!
Yes
Yes
Number of Stars | Image of Distribution | Number of Ratings |
---|---|---|
94% | ||
6% | ||
0% | ||
0% | ||
0% |
"Hi Sandy, I'm sorry that we could not do more for you, but there was no way for us to remove the metal flashings that were bonded on top of the shingles with the adhesive that was used when the system was originally installed on the roof. We removed everything but the metal flashings. If we had removed the metal flashings, it would have ripped every single shingle that is attached to the metal flashings, leaving areas on the roof with no shingles, which would then cause leaks. We did not install the system; it was removed by us. Normally, when these flashings are attached to the roof and the entire solar system is removed, it is permanent."
State Contractor License Requirements
All statements concerning insurance, licenses, and bonds are informational only, and are self-reported. Since insurance, licenses and bonds can expire and can be cancelled, homeowners should always check such information for themselves. To find more licensing information for your state, visit our Find Licensing Requirements page.
*Contact business to see additional licenses.
Sunday: | 6:00 AM - 5:00 PM |
Monday: | 6:00 AM - 5:00 PM |
Tuesday: | 6:00 AM - 5:00 PM |
Wednesday: | 6:00 AM - 5:00 PM |
Thursday: | 6:00 AM - 5:00 PM |
Friday: | 6:00 AM - 5:00 PM |
Saturday: | 6:00 AM - 5:00 PM |