Number of Stars | Image of Distribution | Number of Ratings |
---|---|---|
100% | ||
0% | ||
0% | ||
0% | ||
0% |
Filter reviews by service
Jim and his crew are awesome. I wish I could have added a lot of +++ to the rating.
I Jim called Tuesday, he was out to estimate the next day. He had the city inspectors out and was able to come out with all of the permits in hand and put the new driveway on Saturday.
They were Very Professional they were Quick and Clean.
They arrived at 8 am and were done by 1 pm. Every thing was cleaned up, they removed everything related to the driveway. There was no concrete in the grass and they hosed the street. The only evidence that any one was there was the New Drive and the yellow tape to keep anyone from walking on it.
In the past we have had other driveways poured. This was an insulation!! All of the seams and edges were finished. They placed expansion joints The joints were sealed with latex (at an additional fee.). We were given all of the information that we need to take care of this driveway so that it will last for many years.
We will be using A PLUS HEARTLAND CONCRETE LLC for 2 more driveways and some sidewalk replacements in the future.
Thanks for a GREAT Driveway - Marcia
Jim's phone number was not in the listing and I almost didn't call. His Business card list:
A + Heartland Concrete Constr,.LLC
Since 1985 Residential - Commercial 18 Years BBB Member -
402-677-8600 Cell
The driveway came out amazing plus cost less than all other estimates. Once we said yes he started the next good weather day. the old driveway was removed and new one poored in one day.
They called on the 12th said they would be able to do our driveway the next day, otherwise it would be 4 weeks. We wanted it to be done ASAP, so that worked perfectly for us. The crew arrived the next day at 9:00. They had the old driveway removed in 45 minutes. They had to leave some concrete in the street, while the dump truck with emptied. They told us that they have a new truck, but it was getting painted so they used a third party company. The dump truck returned before the work was done and picked up the rest of the concrete. While the crew waited for the concrete truck, I was given a receipt and I paid them. Looking back, I probably should have waited to pay them until the work was done, but they finished the job no problem. the concrete truck arrived and the driveway was poured. They were completely done at 2:00. They had me come out and look at the work. They had put in two rubber expansion joints along with many other expansion joints. They clearly blocked off the driveway from the street, sidewalks, and front door sidewalk with yellow caution tape. They explained how long to stay off of the driveway clearly. I was very happy with the work. The driveway looks beautiful.
We received a phone call the next day making sure my husband was okay with the work (we was not home while they were working). He also reiterated when we were able to drive on it.
Licensing
State Contractor License Requirements
All statements concerning insurance, licenses, and bonds are informational only, and are self-reported. Since insurance, licenses and bonds can expire and can be cancelled, homeowners should always check such information for themselves. To find more licensing information for your state, visit our Find Licensing Requirements page.
*Contact business to see additional licenses.